Emera (EMA) Construction in Progress (2018 - 2025)

Emera (EMA) has disclosed Construction in Progress for 6 consecutive years, with $1.7 billion as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 19.29% to $1.7 billion in Q4 2025 year-over-year; TTM through Dec 2025 was $1.7 billion, a 19.29% decrease, with the full-year FY2025 number at $1.7 billion, down 21.05% from a year prior.
  • Construction in Progress was $1.7 billion for Q4 2025 at Emera, down from $2.1 billion in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $2.1 billion in Q4 2024 to a low of $1.5 billion in Q4 2023.
  • A 3-year average of $1.8 billion and a median of $1.7 billion in 2025 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: surged 37.52% in 2024, then dropped 19.29% in 2025.
  • Emera's Construction in Progress stood at $1.5 billion in 2023, then soared by 37.52% to $2.1 billion in 2024, then dropped by 19.29% to $1.7 billion in 2025.
  • Per Business Quant, the three most recent readings for EMA's Construction in Progress are $1.7 billion (Q4 2025), $2.1 billion (Q4 2024), and $1.5 billion (Q4 2023).