Emera (EMA) Construction in Progress (2018 - 2024)

Historic Construction in Progress for Emera (EMA) over the last 8 years, with Q4 2024 value amounting to $2.1 billion.

  • Emera's Construction in Progress rose 3751.67% to $2.1 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $2.1 billion, marking a year-over-year increase of 3751.67%. This contributed to the annual value of $2.1 billion for FY2024, which is 3628.64% up from last year.
  • Per Emera's latest filing, its Construction in Progress stood at $2.1 billion for Q4 2024, which was up 3751.67% from $1.5 billion recorded in Q4 2023.
  • In the past 5 years, Emera's Construction in Progress ranged from a high of $2.1 billion in Q4 2024 and a low of $1.5 billion during Q4 2022
  • Its 5-year average for Construction in Progress is $1.7 billion, with a median of $1.8 billion in 2021.
  • As far as peak fluctuations go, Emera's Construction in Progress skyrocketed by 5007.84% in 2020, and later tumbled by 1674.21% in 2022.
  • Over the past 5 years, Emera's Construction in Progress (Quarter) stood at $1.8 billion in 2020, then fell by 2.45% to $1.8 billion in 2021, then fell by 16.74% to $1.5 billion in 2022, then rose by 4.86% to $1.5 billion in 2023, then soared by 37.52% to $2.1 billion in 2024.
  • Its Construction in Progress was $2.1 billion in Q4 2024, compared to $1.5 billion in Q4 2023 and $1.5 billion in Q4 2022.