Growth Metrics

Energy Co Of Parana (ELPC) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Energy Co Of Parana (ELPC) over the last 14 years, with Q3 2025 value amounting to -$174.5 million.

  • Energy Co Of Parana's Construction in Progress fell 4696.68% to -$174.5 million in Q3 2025 from the same period last year, while for Sep 2025 it was -$174.5 million, marking a year-over-year decrease of 4696.68%. This contributed to the annual value of -$106.8 million for FY2024, which is 962.69% up from last year.
  • Per Energy Co Of Parana's latest filing, its Construction in Progress stood at -$174.5 million for Q3 2025, which was down 4696.68% from -$148.6 million recorded in Q2 2025.
  • Energy Co Of Parana's Construction in Progress' 5-year high stood at -$91.2 million during Q1 2022, with a 5-year trough of -$340.6 million in Q4 2021.
  • Over the past 5 years, Energy Co Of Parana's median Construction in Progress value was -$118.2 million (recorded in 2023), while the average stood at -$141.6 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first plummeted by 10410.59% in 2023, then soared by 4306.53% in 2024.
  • Energy Co Of Parana's Construction in Progress (Quarter) stood at -$340.6 million in 2021, then surged by 68.76% to -$106.4 million in 2022, then fell by 11.11% to -$118.2 million in 2023, then rose by 9.63% to -$106.8 million in 2024, then plummeted by 63.34% to -$174.5 million in 2025.
  • Its Construction in Progress stands at -$174.5 million for Q3 2025, versus -$148.6 million for Q2 2025 and -$108.4 million for Q1 2025.