Growth Metrics

Chesapeake Utilities (CPK) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Chesapeake Utilities (CPK) over the last 16 years, with Q3 2025 value amounting to $254.4 million.

  • Chesapeake Utilities' Construction in Progress rose 6288.9% to $254.4 million in Q3 2025 from the same period last year, while for Sep 2025 it was $254.4 million, marking a year-over-year increase of 6288.9%. This contributed to the annual value of $148.1 million for FY2024, which is 3083.04% up from last year.
  • Chesapeake Utilities' Construction in Progress amounted to $254.4 million in Q3 2025, which was up 6288.9% from $199.2 million recorded in Q2 2025.
  • In the past 5 years, Chesapeake Utilities' Construction in Progress ranged from a high of $254.4 million in Q3 2025 and a low of $30.5 million during Q1 2022
  • Over the past 5 years, Chesapeake Utilities' median Construction in Progress value was $78.2 million (recorded in 2021), while the average stood at $100.7 million.
  • As far as peak fluctuations go, Chesapeake Utilities' Construction in Progress crashed by 6192.03% in 2022, and later skyrocketed by 15974.28% in 2024.
  • Chesapeake Utilities' Construction in Progress (Quarter) stood at $49.4 million in 2021, then dropped by 4.25% to $47.3 million in 2022, then skyrocketed by 139.35% to $113.2 million in 2023, then surged by 30.83% to $148.1 million in 2024, then surged by 71.78% to $254.4 million in 2025.
  • Its Construction in Progress was $254.4 million in Q3 2025, compared to $199.2 million in Q2 2025 and $166.6 million in Q1 2025.