Chesapeake Utilities (CPK) Construction in Progress (2016 - 2025)
Chesapeake Utilities has reported Construction in Progress over the past 16 years, most recently at $283.7 million for Q4 2025.
- Quarterly results put Construction in Progress at $283.7 million for Q4 2025, up 91.56% from a year ago — trailing twelve months through Dec 2025 was $283.7 million (up 91.56% YoY), and the annual figure for FY2025 was $283.7 million, up 91.56%.
- Construction in Progress for Q4 2025 was $283.7 million at Chesapeake Utilities, up from $254.4 million in the prior quarter.
- Over the last five years, Construction in Progress for CPK hit a ceiling of $283.7 million in Q4 2025 and a floor of $30.5 million in Q1 2022.
- Median Construction in Progress over the past 5 years was $79.1 million (2021), compared with a mean of $109.8 million.
- Biggest five-year swings in Construction in Progress: tumbled 61.92% in 2022 and later surged 159.74% in 2024.
- Chesapeake Utilities' Construction in Progress stood at $49.4 million in 2021, then dropped by 4.25% to $47.3 million in 2022, then skyrocketed by 139.35% to $113.2 million in 2023, then skyrocketed by 30.83% to $148.1 million in 2024, then soared by 91.56% to $283.7 million in 2025.
- The last three reported values for Construction in Progress were $283.7 million (Q4 2025), $254.4 million (Q3 2025), and $199.2 million (Q2 2025) per Business Quant data.