Growth Metrics

Cms Energy (CMS) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Cms Energy (CMS) over the last 17 years, with Q4 2025 value amounting to $3.1 billion.

  • Cms Energy's Construction in Progress rose 4547.19% to $3.1 billion in Q4 2025 from the same period last year, while for Dec 2025 it was $3.1 billion, marking a year-over-year increase of 4547.19%. This contributed to the annual value of $3.1 billion for FY2025, which is 4547.19% up from last year.
  • Cms Energy's Construction in Progress amounted to $3.1 billion in Q4 2025, which was up 4547.19% from $3.2 billion recorded in Q3 2025.
  • In the past 5 years, Cms Energy's Construction in Progress ranged from a high of $3.2 billion in Q3 2025 and a low of $832.0 million during Q2 2021
  • Over the past 5 years, Cms Energy's median Construction in Progress value was $1.2 billion (recorded in 2022), while the average stood at $1.5 billion.
  • Its Construction in Progress has fluctuated over the past 5 years, first crashed by 3238.36% in 2021, then surged by 13047.62% in 2025.
  • Over the past 5 years, Cms Energy's Construction in Progress (Quarter) stood at $961.0 million in 2021, then increased by 23.0% to $1.2 billion in 2022, then decreased by 20.14% to $944.0 million in 2023, then surged by 122.25% to $2.1 billion in 2024, then surged by 45.47% to $3.1 billion in 2025.
  • Its Construction in Progress stands at $3.1 billion for Q4 2025, versus $3.2 billion for Q3 2025 and $2.8 billion for Q2 2025.