Cms Energy (CMS) Construction in Progress (2016 - 2026)
Cms Energy filings provide 18 years of Construction in Progress readings, the most recent being $3.6 billion for Q1 2026.
- On a quarterly basis, Construction in Progress rose 48.51% to $3.6 billion in Q1 2026 year-over-year; TTM through Mar 2026 was $3.6 billion, a 48.51% increase, with the full-year FY2025 number at $3.1 billion, up 45.47% from a year prior.
- Construction in Progress hit $3.6 billion in Q1 2026 for Cms Energy, up from $3.1 billion in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $3.6 billion in Q1 2026 to a low of $884.0 million in Q1 2022.
- Median Construction in Progress over the past 5 years was $1.4 billion (2023), compared with a mean of $1.8 billion.
- Biggest five-year swings in Construction in Progress: fell 20.14% in 2023 and later soared 130.48% in 2025.
- Cms Energy's Construction in Progress stood at $1.2 billion in 2022, then decreased by 20.14% to $944.0 million in 2023, then skyrocketed by 122.25% to $2.1 billion in 2024, then soared by 45.47% to $3.1 billion in 2025, then increased by 17.76% to $3.6 billion in 2026.
- The last three reported values for Construction in Progress were $3.6 billion (Q1 2026), $3.1 billion (Q4 2025), and $3.2 billion (Q3 2025) per Business Quant data.