Cms Energy (CMS) Construction in Progress (2016 - 2025)
Cms Energy's Construction in Progress history spans 17 years, with the latest figure at $3.1 billion for Q4 2025.
- For Q4 2025, Construction in Progress rose 45.47% year-over-year to $3.1 billion; the TTM value through Dec 2025 reached $3.1 billion, up 45.47%, while the annual FY2025 figure was $3.1 billion, 45.47% up from the prior year.
- Construction in Progress reached $3.1 billion in Q4 2025 per CMS's latest filing, down from $3.2 billion in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $3.2 billion in Q3 2025 to a low of $832.0 million in Q2 2021.
- Average Construction in Progress over 5 years is $1.5 billion, with a median of $1.2 billion recorded in 2022.
- Peak YoY movement for Construction in Progress: tumbled 32.38% in 2021, then surged 130.48% in 2025.
- A 5-year view of Construction in Progress shows it stood at $961.0 million in 2021, then rose by 23.0% to $1.2 billion in 2022, then decreased by 20.14% to $944.0 million in 2023, then skyrocketed by 122.25% to $2.1 billion in 2024, then soared by 45.47% to $3.1 billion in 2025.
- Per Business Quant, the three most recent readings for CMS's Construction in Progress are $3.1 billion (Q4 2025), $3.2 billion (Q3 2025), and $2.8 billion (Q2 2025).