Atmos Energy (ATO) Construction in Progress (2016 - 2025)
Atmos Energy has reported Construction in Progress over the past 16 years, most recently at $1.2 billion for Q3 2025.
- Quarterly Construction in Progress rose 16.12% to $1.2 billion in Q3 2025 from the year-ago period, while the trailing twelve-month figure was $1.2 billion through Sep 2025, up 16.12% year-over-year, with the annual reading at $1.2 billion for FY2025, 16.12% up from the prior year.
- Construction in Progress was $1.2 billion for Q3 2025 at Atmos Energy, up from $1.1 billion in the prior quarter.
- Over five years, Construction in Progress peaked at $1.2 billion in Q3 2025 and troughed at $626.6 million in Q3 2021.
- The 5-year median for Construction in Progress is $939.9 million (2023), against an average of $940.3 million.
- Year-over-year, Construction in Progress soared 49.87% in 2021 and then rose 12.45% in 2023.
- A 5-year view of Construction in Progress shows it stood at $626.6 million in 2021, then skyrocketed by 33.41% to $835.9 million in 2022, then grew by 12.45% to $939.9 million in 2023, then rose by 13.18% to $1.1 billion in 2024, then rose by 16.12% to $1.2 billion in 2025.
- Per Business Quant, the three most recent readings for ATO's Construction in Progress are $1.2 billion (Q3 2025), $1.1 billion (Q3 2024), and $939.9 million (Q3 2023).