Aes (AES) Construction in Progress (2016 - 2025)
Aes has reported Construction in Progress over the past 17 years, most recently at $1.3 billion for Q4 2025.
- Quarterly results put Construction in Progress at $1.3 billion for Q4 2025, changed N/A from a year ago — trailing twelve months through Dec 2025 was $1.3 billion (changed N/A YoY), and the annual figure for FY2025 was $1.3 billion, changed.
- Construction in Progress for Q4 2025 was $1.3 billion at Aes, down from $9.0 billion in the prior quarter.
- Over the last five years, Construction in Progress for AES hit a ceiling of $9.0 billion in Q2 2024 and a floor of $1.3 billion in Q4 2025.
- Median Construction in Progress over the past 5 years was $5.4 billion (2021), compared with a mean of $5.3 billion.
- Biggest five-year swings in Construction in Progress: tumbled 44.89% in 2022 and later soared 111.4% in 2023.
- Aes' Construction in Progress stood at $2.4 billion in 2021, then surged by 91.43% to $4.6 billion in 2022, then soared by 69.83% to $7.8 billion in 2023, then rose by 15.28% to $9.0 billion in 2024, then plummeted by 86.14% to $1.3 billion in 2025.
- The last three reported values for Construction in Progress were $1.3 billion (Q4 2025), $9.0 billion (Q2 2024), and $8.8 billion (Q1 2024) per Business Quant data.