Wipro (WIT) Construction in Progress (2017 - 2025)
Wipro (WIT) has disclosed Construction in Progress for 9 consecutive years, with $25.5 million as the latest value for Q1 2025.
- On a quarterly basis, Construction in Progress fell 71.65% to $25.5 million in Q1 2025 year-over-year; TTM through Mar 2025 was $25.5 million, a 71.65% decrease, with the full-year FY2025 number at $25.5 million, down 71.74% from a year prior.
- Construction in Progress was $25.5 million for Q1 2025 at Wipro, down from $90.1 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $264.8 million in Q1 2021 to a low of $25.5 million in Q1 2025.
- A 5-year average of $134.8 million and a median of $90.1 million in 2024 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: grew 17.1% in 2024, then tumbled 71.65% in 2025.
- Wipro's Construction in Progress stood at $264.8 million in 2021, then fell by 18.2% to $216.6 million in 2022, then tumbled by 64.49% to $76.9 million in 2023, then rose by 17.1% to $90.1 million in 2024, then crashed by 71.65% to $25.5 million in 2025.
- Per Business Quant, the three most recent readings for WIT's Construction in Progress are $25.5 million (Q1 2025), $90.1 million (Q1 2024), and $76.9 million (Q1 2023).