Growth Metrics

Wipro (WIT) Construction in Progress (2017 - 2025)

Wipro has reported Construction in Progress over the past 9 years, most recently at $25.5 million for Q1 2025.

  • Quarterly Construction in Progress fell 71.65% to $25.5 million in Q1 2025 from the year-ago period, while the trailing twelve-month figure was $25.5 million through Mar 2025, down 71.65% year-over-year, with the annual reading at $25.5 million for FY2025, 71.65% down from the prior year.
  • Construction in Progress was $25.5 million for Q1 2025 at Wipro, down from $90.1 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $264.8 million in Q1 2021 and troughed at $25.5 million in Q1 2025.
  • The 5-year median for Construction in Progress is $90.1 million (2024), against an average of $134.8 million.
  • Year-over-year, Construction in Progress grew 17.1% in 2024 and then tumbled 71.65% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $264.8 million in 2021, then decreased by 18.2% to $216.6 million in 2022, then plummeted by 64.49% to $76.9 million in 2023, then increased by 17.1% to $90.1 million in 2024, then tumbled by 71.65% to $25.5 million in 2025.
  • Per Business Quant, the three most recent readings for WIT's Construction in Progress are $25.5 million (Q1 2025), $90.1 million (Q1 2024), and $76.9 million (Q1 2023).