KPIs & Operating Metrics(New)
Growth Metrics

Cognizant Technology Solutions (CTSH) Construction in Progress: 2009-2013

  • Cognizant Technology Solutions' Construction in Progress rose 40.70% to $360.6 million in Q4 2013 from the same period last year, while for Dec 2013 it was $360.6 million, marking a year-over-year increase of 40.70%. This contributed to the annual value of $360.6 million for FY2013, which is 40.70% up from last year.
  • Per Cognizant Technology Solutions' latest filing, its Construction in Progress stood at $360.6 million for Q4 2013, which was up 40.70% from $256.3 million recorded in Q4 2012.
  • Cognizant Technology Solutions' Construction in Progress' 5-year high stood at $360.6 million during Q4 2013, with a 5-year trough of $70.6 million in Q4 2009.
  • Over the past 3 years, Cognizant Technology Solutions' median Construction in Progress value was $256.3 million (recorded in 2012), while the average stood at $276.0 million.
  • Data for Cognizant Technology Solutions' Construction in Progress shows a peak YoY surged of 121.10% (in 2011) over the last 5 years.
  • Cognizant Technology Solutions' Construction in Progress (Quarterly) stood at $70.6 million in 2009, then spiked by 35.19% to $95.5 million in 2010, then soared by 121.10% to $211.1 million in 2011, then grew by 21.38% to $256.3 million in 2012, then skyrocketed by 40.70% to $360.6 million in 2013.
  • Its last three reported values are $360.6 million in Q4 2013, $256.3 million for Q4 2012, and $211.1 million during Q4 2011.