Avnet (AVT) Construction in Progress (2016 - 2025)
Avnet (AVT) has disclosed Construction in Progress for 13 consecutive years, with $217.2 million as the latest value for Q2 2025.
- Quarterly Construction in Progress fell 4.59% to $217.2 million in Q2 2025 from the year-ago period, while the trailing twelve-month figure was $217.2 million through Jun 2025, down 4.59% year-over-year, with the annual reading at $217.2 million for FY2025, 4.59% down from the prior year.
- Construction in Progress for Q2 2025 was $217.2 million at Avnet, down from $227.6 million in the prior quarter.
- The five-year high for Construction in Progress was $227.6 million in Q2 2024, with the low at $4.4 million in Q3 2021.
- Average Construction in Progress over 5 years is $118.8 million, with a median of $139.0 million recorded in 2023.
- The sharpest move saw Construction in Progress tumbled 83.45% in 2021, then skyrocketed 2304.46% in 2023.
- Over 5 years, Construction in Progress stood at $4.4 million in 2021, then skyrocketed by 32.17% to $5.8 million in 2022, then surged by 2304.46% to $139.0 million in 2023, then surged by 63.78% to $227.6 million in 2024, then dropped by 4.59% to $217.2 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $217.2 million, $227.6 million, and $139.0 million for Q2 2025, Q2 2024, and Q3 2023 respectively.