Growth Metrics

Infosys (INFY) Construction in Progress (2017 - 2026)

Infosys has reported Construction in Progress over the past 12 years, most recently at $5.3 billion for Q1 2026.

  • For Q1 2026, Construction in Progress fell 35.38% year-over-year to $5.3 billion; the TTM value through Mar 2026 reached $5.3 billion, down 35.38%, while the annual FY2026 figure was $5.3 billion, 35.38% down from the prior year.
  • Construction in Progress for Q1 2026 was $5.3 billion at Infosys, down from $8.1 billion in the prior quarter.
  • Over five years, Construction in Progress peaked at $8.1 billion in Q1 2025 and troughed at $54.0 million in Q1 2024.
  • A 5-year average of $2.7 billion and a median of $67.0 million in 2022 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: crashed 53.79% in 2022 and later soared 14974.07% in 2025.
  • Year by year, Construction in Progress stood at $67.0 million in 2022, then dropped by 17.91% to $55.0 million in 2023, then dropped by 1.82% to $54.0 million in 2024, then soared by 14974.07% to $8.1 billion in 2025, then plummeted by 35.38% to $5.3 billion in 2026.
  • Business Quant data shows Construction in Progress for INFY at $5.3 billion in Q1 2026, $8.1 billion in Q1 2025, and $54.0 million in Q1 2024.