Growth Metrics

CDW (CDW) Construction in Progress: 2011-2020

  • CDW's Construction in Progress rose 118.03% to $50.8 million in Q4 2020 from the same period last year, while for Dec 2020 it was $50.8 million, marking a year-over-year increase of 118.03%. This contributed to the annual value of $50.8 million for FY2020, which is 118.03% up from last year.
  • As of Q4 2020, CDW's Construction in Progress stood at $50.8 million, which was up 118.03% from $23.3 million recorded in Q4 2019.
  • CDW's 5-year Construction in Progress high stood at $50.8 million for Q4 2020, and its period low was $17.9 million during Q4 2017.
  • Over the past 3 years, CDW's median Construction in Progress value was $24.5 million (recorded in 2018), while the average stood at $32.9 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first fell by 14.64% in 2016, then soared by 118.03% in 2020.
  • Over the past 5 years, CDW's Construction in Progress (Quarterly) stood at $20.4 million in 2016, then decreased by 12.25% to $17.9 million in 2017, then soared by 36.87% to $24.5 million in 2018, then decreased by 4.90% to $23.3 million in 2019, then skyrocketed by 118.03% to $50.8 million in 2020.
  • Its last three reported values are $50.8 million in Q4 2020, $23.3 million for Q4 2019, and $24.5 million during Q4 2018.