Cdw (CDW) Construction in Progress (2016 - 2020)
Historic Construction in Progress for Cdw (CDW) over the last 10 years, with Q4 2020 value amounting to $50.8 million.
- Cdw's Construction in Progress rose 11802.58% to $50.8 million in Q4 2020 from the same period last year, while for Dec 2020 it was $50.8 million, marking a year-over-year increase of 11802.58%. This contributed to the annual value of $50.8 million for FY2020, which is 11802.58% up from last year.
- Per Cdw's latest filing, its Construction in Progress stood at $50.8 million for Q4 2020, which was up 11802.58% from $23.3 million recorded in Q4 2019.
- Over the past 5 years, Cdw's Construction in Progress peaked at $50.8 million during Q4 2020, and registered a low of $17.9 million during Q4 2017.
- In the last 5 years, Cdw's Construction in Progress had a median value of $23.3 million in 2019 and averaged $27.4 million.
- Per our database at Business Quant, Cdw's Construction in Progress plummeted by 1464.44% in 2016 and then surged by 11802.58% in 2020.
- Quarter analysis of 5 years shows Cdw's Construction in Progress stood at $20.4 million in 2016, then decreased by 12.25% to $17.9 million in 2017, then soared by 36.87% to $24.5 million in 2018, then decreased by 4.9% to $23.3 million in 2019, then soared by 118.03% to $50.8 million in 2020.
- Its last three reported values are $50.8 million in Q4 2020, $23.3 million for Q4 2019, and $24.5 million during Q4 2018.