Taiwan Semiconductor Manufacturing (TSMWF) Other Gross PP&E Adjustments (2016 - 2025)
Historic Other Gross PP&E Adjustments for Taiwan Semiconductor Manufacturing (TSMWF) over the last 13 years, with Q3 2025 value amounting to -$1.4 billion.
- Taiwan Semiconductor Manufacturing's Other Gross PP&E Adjustments fell 1750.54% to -$1.4 billion in Q3 2025 from the same period last year, while for Sep 2025 it was -$1.4 billion, marking a year-over-year decrease of 1750.54%. This contributed to the annual value of -$1.2 billion for FY2024, which is 221.73% up from last year.
- Latest data reveals that Taiwan Semiconductor Manufacturing reported Other Gross PP&E Adjustments of -$1.4 billion as of Q3 2025, which was down 1750.54% from -$1.4 billion recorded in Q2 2025.
- Taiwan Semiconductor Manufacturing's Other Gross PP&E Adjustments' 5-year high stood at -$1.2 billion during Q1 2021, with a 5-year trough of -$1.4 billion in Q3 2025.
- For the 5-year period, Taiwan Semiconductor Manufacturing's Other Gross PP&E Adjustments averaged around -$1.3 billion, with its median value being -$1.3 billion (2025).
- As far as peak fluctuations go, Taiwan Semiconductor Manufacturing's Other Gross PP&E Adjustments tumbled by 7037.67% in 2021, and later soared by 982.7% in 2024.
- Quarter analysis of 5 years shows Taiwan Semiconductor Manufacturing's Other Gross PP&E Adjustments stood at -$1.2 billion in 2021, then dropped by 14.0% to -$1.4 billion in 2022, then increased by 7.88% to -$1.3 billion in 2023, then grew by 2.22% to -$1.2 billion in 2024, then dropped by 16.35% to -$1.4 billion in 2025.
- Its Other Gross PP&E Adjustments was -$1.4 billion in Q3 2025, compared to -$1.4 billion in Q2 2025 and -$1.3 billion in Q1 2025.