Tootsie Roll Industries (TR) Construction in Progress (2016 - 2025)
Tootsie Roll Industries' Construction in Progress history spans 17 years, with the latest figure at $15.5 million for Q4 2025.
- For Q4 2025, Construction in Progress rose 126.92% year-over-year to $15.5 million; the TTM value through Dec 2025 reached $15.5 million, up 126.92%, while the annual FY2025 figure was $15.5 million, 126.92% up from the prior year.
- Construction in Progress for Q4 2025 was $15.5 million at Tootsie Roll Industries, down from $29.2 million in the prior quarter.
- Across five years, Construction in Progress topped out at $39.7 million in Q3 2021 and bottomed at $4.3 million in Q4 2022.
- The 5-year median for Construction in Progress is $18.4 million (2024), against an average of $19.0 million.
- The largest annual shift saw Construction in Progress skyrocketed 169.74% in 2021 before it tumbled 71.81% in 2022.
- A 5-year view of Construction in Progress shows it stood at $15.3 million in 2021, then crashed by 71.81% to $4.3 million in 2022, then surged by 160.74% to $11.3 million in 2023, then plummeted by 39.52% to $6.8 million in 2024, then surged by 126.92% to $15.5 million in 2025.
- Per Business Quant, the three most recent readings for TR's Construction in Progress are $15.5 million (Q4 2025), $29.2 million (Q3 2025), and $17.9 million (Q2 2025).