Staar Surgical (STAA) Construction in Progress (2018 - 2025)
Historic Construction in Progress for Staar Surgical (STAA) over the last 8 years, with Q3 2025 value amounting to $29.0 million.
- Staar Surgical's Construction in Progress fell 2348.12% to $29.0 million in Q3 2025 from the same period last year, while for Sep 2025 it was $29.0 million, marking a year-over-year decrease of 2348.12%. This contributed to the annual value of $32.0 million for FY2024, which is 2068.68% down from last year.
- Per Staar Surgical's latest filing, its Construction in Progress stood at $29.0 million for Q3 2025, which was down 2348.12% from $30.6 million recorded in Q2 2025.
- In the past 5 years, Staar Surgical's Construction in Progress registered a high of $45.1 million during Q1 2024, and its lowest value of $11.1 million during Q1 2021.
- Its 5-year average for Construction in Progress is $29.4 million, with a median of $31.0 million in 2022.
- As far as peak fluctuations go, Staar Surgical's Construction in Progress skyrocketed by 10015.08% in 2022, and later tumbled by 3508.38% in 2025.
- Staar Surgical's Construction in Progress (Quarter) stood at $21.8 million in 2021, then surged by 47.84% to $32.3 million in 2022, then grew by 25.09% to $40.4 million in 2023, then decreased by 20.69% to $32.0 million in 2024, then decreased by 9.55% to $29.0 million in 2025.
- Its Construction in Progress stands at $29.0 million for Q3 2025, versus $30.6 million for Q2 2025 and $29.3 million for Q1 2025.