Growth Metrics

Staar Surgical (STAA) Construction in Progress (2018 - 2026)

Staar Surgical's Construction in Progress history spans 9 years, with the latest figure at $30.3 million for Q1 2026.

  • For Q1 2026, Construction in Progress fell 5.23% year-over-year to $30.3 million; the TTM value through Jan 2026 reached $30.3 million, down 5.23%, while the annual FY2026 figure was $30.3 million, 5.23% down from the prior year.
  • Construction in Progress reached $30.3 million in Q1 2026 per STAA's latest filing, up from $29.0 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $45.1 million in Q1 2024 to a low of $25.2 million in Q2 2022.
  • Average Construction in Progress over 5 years is $33.9 million, with a median of $32.1 million recorded in 2022.
  • Peak YoY movement for Construction in Progress: skyrocketed 100.15% in 2022, then tumbled 35.08% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $32.3 million in 2022, then increased by 25.09% to $40.4 million in 2023, then fell by 20.69% to $32.0 million in 2024, then fell by 9.55% to $29.0 million in 2025, then increased by 4.78% to $30.3 million in 2026.
  • Per Business Quant, the three most recent readings for STAA's Construction in Progress are $30.3 million (Q1 2026), $29.0 million (Q3 2025), and $30.6 million (Q2 2025).