Intuitive Surgical (ISRG) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Intuitive Surgical (ISRG) over the last 16 years, with Q4 2025 value amounting to $638.1 million.
- Intuitive Surgical's Construction in Progress fell 6089.11% to $638.1 million in Q4 2025 from the same period last year, while for Dec 2025 it was $638.1 million, marking a year-over-year decrease of 6089.11%. This contributed to the annual value of $638.1 million for FY2025, which is 6089.11% down from last year.
- As of Q4 2025, Intuitive Surgical's Construction in Progress stood at $638.1 million, which was down 6089.11% from $1.6 billion recorded in Q4 2024.
- Intuitive Surgical's 5-year Construction in Progress high stood at $1.6 billion for Q4 2024, and its period low was $209.7 million during Q4 2021.
- Its 5-year average for Construction in Progress is $1.0 billion, with a median of $1.2 billion in 2023.
- In the last 5 years, Intuitive Surgical's Construction in Progress soared by 19022.41% in 2022 and then crashed by 6089.11% in 2025.
- Over the past 5 years, Intuitive Surgical's Construction in Progress (Quarter) stood at $209.7 million in 2021, then surged by 190.22% to $608.6 million in 2022, then soared by 122.59% to $1.4 billion in 2023, then rose by 20.44% to $1.6 billion in 2024, then crashed by 60.89% to $638.1 million in 2025.
- Its Construction in Progress stands at $638.1 million for Q4 2025, versus $1.6 billion for Q4 2024 and $1.6 billion for Q3 2024.