Growth Metrics

Intuitive Surgical (ISRG) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Intuitive Surgical (ISRG) over the last 16 years, with Q4 2025 value amounting to $638.1 million.

  • Intuitive Surgical's Construction in Progress fell 6089.11% to $638.1 million in Q4 2025 from the same period last year, while for Dec 2025 it was $638.1 million, marking a year-over-year decrease of 6089.11%. This contributed to the annual value of $638.1 million for FY2025, which is 6089.11% down from last year.
  • Intuitive Surgical's Construction in Progress amounted to $638.1 million in Q4 2025, which was down 6089.11% from $1.6 billion recorded in Q4 2024.
  • In the past 5 years, Intuitive Surgical's Construction in Progress registered a high of $1.6 billion during Q4 2024, and its lowest value of $209.7 million during Q4 2021.
  • Moreover, its 5-year median value for Construction in Progress was $1.2 billion (2023), whereas its average is $1.0 billion.
  • Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 19022.41% in 2022, then plummeted by 6089.11% in 2025.
  • Over the past 5 years, Intuitive Surgical's Construction in Progress (Quarter) stood at $209.7 million in 2021, then soared by 190.22% to $608.6 million in 2022, then skyrocketed by 122.59% to $1.4 billion in 2023, then grew by 20.44% to $1.6 billion in 2024, then plummeted by 60.89% to $638.1 million in 2025.
  • Its Construction in Progress was $638.1 million in Q4 2025, compared to $1.6 billion in Q4 2024 and $1.6 billion in Q3 2024.