Intuitive Surgical (ISRG) Construction in Progress (2016 - 2025)
Intuitive Surgical has reported Construction in Progress over the past 16 years, most recently at $638.1 million for Q4 2025.
- Quarterly Construction in Progress fell 60.89% to $638.1 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $638.1 million through Dec 2025, down 60.89% year-over-year, with the annual reading at $638.1 million for FY2025, 60.89% down from the prior year.
- Construction in Progress was $638.1 million for Q4 2025 at Intuitive Surgical, down from $1.6 billion in the prior quarter.
- Over five years, Construction in Progress peaked at $1.6 billion in Q4 2024 and troughed at $209.7 million in Q4 2021.
- The 5-year median for Construction in Progress is $1.2 billion (2023), against an average of $1.0 billion.
- Biggest five-year swings in Construction in Progress: soared 190.22% in 2022 and later plummeted 60.89% in 2025.
- Tracing ISRG's Construction in Progress over 5 years: stood at $209.7 million in 2021, then soared by 190.22% to $608.6 million in 2022, then soared by 122.59% to $1.4 billion in 2023, then increased by 20.44% to $1.6 billion in 2024, then crashed by 60.89% to $638.1 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $638.1 million, $1.6 billion, and $1.6 billion for Q4 2025, Q4 2024, and Q3 2024 respectively.