Boston Scientific (BSX) Construction in Progress (2016 - 2025)
Boston Scientific (BSX) has disclosed Construction in Progress for 17 consecutive years, with $1.2 billion as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 12.17% to $1.2 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $1.2 billion through Dec 2025, up 12.17% year-over-year, with the annual reading at $1.2 billion for FY2025, 12.17% up from the prior year.
- Construction in Progress hit $1.2 billion in Q4 2025 for Boston Scientific, up from $936.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $1.2 billion in Q4 2025 to a low of $418.0 million in Q1 2021.
- Historically, Construction in Progress has averaged $737.6 million across 5 years, with a median of $648.0 million in 2021.
- Biggest five-year swings in Construction in Progress: dropped 7.11% in 2021 and later skyrocketed 55.2% in 2024.
- Year by year, Construction in Progress stood at $605.0 million in 2021, then dropped by 1.16% to $598.0 million in 2022, then surged by 43.31% to $857.0 million in 2023, then grew by 20.77% to $1.0 billion in 2024, then grew by 12.17% to $1.2 billion in 2025.
- Business Quant data shows Construction in Progress for BSX at $1.2 billion in Q4 2025, $936.0 million in Q3 2025, and $1.0 billion in Q2 2025.