KPIs & Operating Metrics(New)
Growth Metrics

Abbott Laboratories (ABT) Construction in Progress (2016 - 2025)

Abbott Laboratories' Construction in Progress history spans 17 years, with the latest figure at $2.6 billion for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 3.18% to $2.6 billion in Q4 2025 year-over-year; TTM through Dec 2025 was $2.6 billion, a 3.18% increase, with the full-year FY2025 number at $2.6 billion, up 3.18% from a year prior.
  • Construction in Progress hit $2.6 billion in Q4 2025 for Abbott Laboratories, up from $2.5 billion in the prior quarter.
  • Over the last five years, Construction in Progress for ABT hit a ceiling of $2.6 billion in Q4 2025 and a floor of $1.3 billion in Q4 2021.
  • Historically, Construction in Progress has averaged $2.0 billion across 5 years, with a median of $2.1 billion in 2023.
  • Biggest five-year swings in Construction in Progress: fell 3.91% in 2021 and later surged 39.08% in 2023.
  • Tracing ABT's Construction in Progress over 5 years: stood at $1.3 billion in 2021, then increased by 13.8% to $1.5 billion in 2022, then surged by 39.08% to $2.1 billion in 2023, then rose by 20.54% to $2.5 billion in 2024, then rose by 3.18% to $2.6 billion in 2025.
  • Business Quant data shows Construction in Progress for ABT at $2.6 billion in Q4 2025, $2.5 billion in Q4 2024, and $2.1 billion in Q4 2023.