Cash Flow Statement
Growth Metrics

Spectrum Brands Holdings (SPB) Construction in Progress (2016 - 2018)

Spectrum Brands Holdings has reported Construction in Progress over the past 3 years, most recently at $43.8 million for Q1 2018.

  • Quarterly Construction in Progress changed N/A to $43.8 million in Q1 2018 from the year-ago period, while the trailing twelve-month figure was $43.8 million through Mar 2018, changed N/A year-over-year, with the annual reading at $40.4 million for FY2017, 29.98% down from the prior year.
  • Construction in Progress was $43.8 million for Q1 2018 at Spectrum Brands Holdings, down from $45.7 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $79.3 million in Q2 2017 and troughed at $40.4 million in Q3 2017.
  • The 3-year median for Construction in Progress is $45.7 million (2017), against an average of $53.4 million.
  • The largest YoY upside for Construction in Progress was 29.98% in 2017 against a maximum downside of 29.98% in 2017.
  • A 3-year view of Construction in Progress shows it stood at $57.7 million in 2016, then decreased by 20.8% to $45.7 million in 2017, then decreased by 4.16% to $43.8 million in 2018.
  • Per Business Quant, the three most recent readings for SPB's Construction in Progress are $43.8 million (Q1 2018), $45.7 million (Q4 2017), and $40.4 million (Q3 2017).