Spectrum Brands Holdings (SPB) Construction in Progress (2016 - 2018)
Spectrum Brands Holdings (SPB) has disclosed Construction in Progress for 3 consecutive years, with $43.8 million as the latest value for Q1 2018.
- Quarterly Construction in Progress changed N/A to $43.8 million in Q1 2018 from the year-ago period, while the trailing twelve-month figure was $43.8 million through Mar 2018, changed N/A year-over-year, with the annual reading at $40.4 million for FY2017, 29.98% down from the prior year.
- Construction in Progress for Q1 2018 was $43.8 million at Spectrum Brands Holdings, down from $45.7 million in the prior quarter.
- The five-year high for Construction in Progress was $79.3 million in Q2 2017, with the low at $40.4 million in Q3 2017.
- Average Construction in Progress over 3 years is $53.4 million, with a median of $45.7 million recorded in 2017.
- Peak annual rise in Construction in Progress hit 29.98% in 2017, while the deepest fall reached 29.98% in 2017.
- Over 3 years, Construction in Progress stood at $57.7 million in 2016, then dropped by 20.8% to $45.7 million in 2017, then dropped by 4.16% to $43.8 million in 2018.
- According to Business Quant data, Construction in Progress over the past three periods came in at $43.8 million, $45.7 million, and $40.4 million for Q1 2018, Q4 2017, and Q3 2017 respectively.