Growth Metrics

Campbell'S (CPB) Construction in Progress (2016 - 2025)

Campbell'S has reported Construction in Progress over the past 16 years, most recently at $344.0 million for Q3 2025.

  • Quarterly results put Construction in Progress at $344.0 million for Q3 2025, up 9.55% from a year ago — trailing twelve months through Aug 2025 was $344.0 million (up 9.55% YoY), and the annual figure for FY2025 was $344.0 million, up 9.55%.
  • Construction in Progress for Q3 2025 was $344.0 million at Campbell'S, up from $314.0 million in the prior quarter.
  • Over the last five years, Construction in Progress for CPB hit a ceiling of $344.0 million in Q3 2025 and a floor of $141.0 million in Q3 2022.
  • Median Construction in Progress over the past 5 years was $291.0 million (2023), compared with a mean of $255.8 million.
  • Biggest five-year swings in Construction in Progress: tumbled 31.02% in 2021 and later soared 106.38% in 2023.
  • Campbell'S's Construction in Progress stood at $189.0 million in 2021, then fell by 25.4% to $141.0 million in 2022, then soared by 106.38% to $291.0 million in 2023, then rose by 7.9% to $314.0 million in 2024, then rose by 9.55% to $344.0 million in 2025.
  • The last three reported values for Construction in Progress were $344.0 million (Q3 2025), $314.0 million (Q3 2024), and $291.0 million (Q3 2023) per Business Quant data.