Growth Metrics

Rocky Brands (RCKY) Construction in Progress (2016 - 2025)

Rocky Brands (RCKY) has 10 years of Construction in Progress data on record, last reported at $12.0 million in Q4 2025.

  • On a quarterly basis, Construction in Progress rose 9.46% to $12.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $12.0 million, a 9.46% increase, with the full-year FY2025 number at $12.0 million, up 9.46% from a year prior.
  • Construction in Progress reached $12.0 million in Q4 2025 per RCKY's latest filing, up from $11.0 million in the prior quarter.
  • Over the last five years, Construction in Progress for RCKY hit a ceiling of $14.5 million in Q4 2021 and a floor of $8.5 million in Q4 2023.
  • A 5-year average of $11.5 million and a median of $11.8 million in 2022 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: skyrocketed 147.08% in 2021, then decreased 28.35% in 2023.
  • Tracing RCKY's Construction in Progress over 5 years: stood at $14.5 million in 2021, then dropped by 18.36% to $11.8 million in 2022, then dropped by 28.35% to $8.5 million in 2023, then increased by 29.76% to $11.0 million in 2024, then grew by 9.46% to $12.0 million in 2025.
  • Business Quant data shows Construction in Progress for RCKY at $12.0 million in Q4 2025, $11.0 million in Q4 2024, and $8.5 million in Q4 2023.