Rocky Brands (RCKY) Construction in Progress (2016 - 2025)
Rocky Brands (RCKY) has disclosed Construction in Progress for 8 consecutive years, with $12.0 million as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress rose 9.46% to $12.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $12.0 million, a 9.46% increase, with the full-year FY2025 number at $12.0 million, up 9.46% from a year prior.
- Construction in Progress was $12.0 million for Q4 2025 at Rocky Brands, up from $11.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $14.5 million in Q4 2021 to a low of $8.5 million in Q4 2023.
- A 5-year average of $11.5 million and a median of $11.8 million in 2022 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: surged 147.08% in 2021, then fell 28.35% in 2023.
- Rocky Brands' Construction in Progress stood at $14.5 million in 2021, then decreased by 18.36% to $11.8 million in 2022, then decreased by 28.35% to $8.5 million in 2023, then rose by 29.76% to $11.0 million in 2024, then increased by 9.46% to $12.0 million in 2025.
- Per Business Quant, the three most recent readings for RCKY's Construction in Progress are $12.0 million (Q4 2025), $11.0 million (Q4 2024), and $8.5 million (Q4 2023).