Rocky Brands (RCKY) Construction in Progress (2016 - 2025)
Rocky Brands (RCKY) has disclosed Construction in Progress for 10 consecutive years, with $12.0 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 9.46% to $12.0 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $12.0 million through Dec 2025, up 9.46% year-over-year, with the annual reading at $12.0 million for FY2025, 9.46% up from the prior year.
- Construction in Progress for Q4 2025 was $12.0 million at Rocky Brands, up from $11.0 million in the prior quarter.
- The five-year high for Construction in Progress was $14.5 million in Q4 2021, with the low at $8.5 million in Q4 2023.
- Average Construction in Progress over 5 years is $11.5 million, with a median of $11.8 million recorded in 2022.
- The sharpest move saw Construction in Progress soared 147.08% in 2021, then dropped 28.35% in 2023.
- Over 5 years, Construction in Progress stood at $14.5 million in 2021, then fell by 18.36% to $11.8 million in 2022, then fell by 28.35% to $8.5 million in 2023, then grew by 29.76% to $11.0 million in 2024, then rose by 9.46% to $12.0 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $12.0 million, $11.0 million, and $8.5 million for Q4 2025, Q4 2024, and Q4 2023 respectively.