KPIs & Operating Metrics(New)
Growth Metrics

Ralph Lauren (RL) Construction in Progress (2016 - 2025)

Ralph Lauren has reported Construction in Progress over the past 15 years, most recently at $85.6 million for Q4 2025.

  • Quarterly results put Construction in Progress at $85.6 million for Q4 2025, up 22.46% from a year ago — trailing twelve months through Dec 2025 was $85.6 million (up 22.46% YoY), and the annual figure for FY2025 was $91.1 million, up 97.19%.
  • Construction in Progress for Q4 2025 was $85.6 million at Ralph Lauren, down from $95.5 million in the prior quarter.
  • Over the last five years, Construction in Progress for RL hit a ceiling of $117.8 million in Q2 2025 and a floor of $32.4 million in Q2 2021.
  • Median Construction in Progress over the past 5 years was $53.0 million (2021), compared with a mean of $59.7 million.
  • Biggest five-year swings in Construction in Progress: decreased 24.14% in 2024 and later surged 142.89% in 2025.
  • Ralph Lauren's Construction in Progress stood at $51.8 million in 2021, then rose by 4.83% to $54.3 million in 2022, then dropped by 20.99% to $42.9 million in 2023, then soared by 62.94% to $69.9 million in 2024, then increased by 22.46% to $85.6 million in 2025.
  • The last three reported values for Construction in Progress were $85.6 million (Q4 2025), $95.5 million (Q3 2025), and $117.8 million (Q2 2025) per Business Quant data.