KPIs & Operating Metrics(New)
Growth Metrics

Ralph Lauren (RL) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Ralph Lauren (RL) over the last 15 years, with Q4 2025 value amounting to $85.6 million.

  • Ralph Lauren's Construction in Progress rose 2246.07% to $85.6 million in Q4 2025 from the same period last year, while for Dec 2025 it was $85.6 million, marking a year-over-year increase of 2246.07%. This contributed to the annual value of $91.1 million for FY2025, which is 9718.61% up from last year.
  • As of Q4 2025, Ralph Lauren's Construction in Progress stood at $85.6 million, which was up 2246.07% from $95.5 million recorded in Q3 2025.
  • In the past 5 years, Ralph Lauren's Construction in Progress ranged from a high of $117.8 million in Q2 2025 and a low of $32.4 million during Q2 2021
  • Over the past 5 years, Ralph Lauren's median Construction in Progress value was $53.0 million (recorded in 2021), while the average stood at $59.7 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first tumbled by 2413.79% in 2024, then soared by 14288.66% in 2025.
  • Over the past 5 years, Ralph Lauren's Construction in Progress (Quarter) stood at $51.8 million in 2021, then increased by 4.83% to $54.3 million in 2022, then decreased by 20.99% to $42.9 million in 2023, then soared by 62.94% to $69.9 million in 2024, then grew by 22.46% to $85.6 million in 2025.
  • Its Construction in Progress was $85.6 million in Q4 2025, compared to $95.5 million in Q3 2025 and $117.8 million in Q2 2025.