Tapestry (TPR) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Tapestry (TPR) over the last 17 years, with Q2 2025 value amounting to $40.8 million.
- Tapestry's Construction in Progress fell 331.75% to $40.8 million in Q2 2025 from the same period last year, while for Jun 2025 it was $40.8 million, marking a year-over-year decrease of 331.75%. This contributed to the annual value of $40.8 million for FY2025, which is 331.75% down from last year.
- As of Q2 2025, Tapestry's Construction in Progress stood at $40.8 million, which was down 331.75% from $42.2 million recorded in Q2 2024.
- In the past 5 years, Tapestry's Construction in Progress ranged from a high of $45.6 million in Q3 2021 and a low of $14.3 million during Q3 2023
- For the 5-year period, Tapestry's Construction in Progress averaged around $36.7 million, with its median value being $40.8 million (2025).
- As far as peak fluctuations go, Tapestry's Construction in Progress crashed by 6460.4% in 2023, and later surged by 19510.49% in 2024.
- Over the past 5 years, Tapestry's Construction in Progress (Quarter) stood at $45.6 million in 2021, then decreased by 11.4% to $40.4 million in 2022, then tumbled by 64.6% to $14.3 million in 2023, then surged by 195.1% to $42.2 million in 2024, then decreased by 3.32% to $40.8 million in 2025.
- Its Construction in Progress stands at $40.8 million for Q2 2025, versus $42.2 million for Q2 2024 and $14.3 million for Q3 2023.