KPIs & Operating Metrics(New)
Growth Metrics

Tapestry (TPR) Construction in Progress (2016 - 2025)

Tapestry (TPR) has disclosed Construction in Progress for 17 consecutive years, with $40.8 million as the latest value for Q2 2025.

  • Quarterly Construction in Progress fell 3.32% to $40.8 million in Q2 2025 from the year-ago period, while the trailing twelve-month figure was $40.8 million through Jun 2025, down 3.32% year-over-year, with the annual reading at $40.8 million for FY2025, 3.32% down from the prior year.
  • Construction in Progress hit $40.8 million in Q2 2025 for Tapestry, down from $42.2 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $45.6 million in Q3 2021 to a low of $14.3 million in Q3 2023.
  • Historically, Construction in Progress has averaged $36.7 million across 5 years, with a median of $40.8 million in 2025.
  • Biggest five-year swings in Construction in Progress: tumbled 64.6% in 2023 and later skyrocketed 195.1% in 2024.
  • Year by year, Construction in Progress stood at $45.6 million in 2021, then dropped by 11.4% to $40.4 million in 2022, then crashed by 64.6% to $14.3 million in 2023, then surged by 195.1% to $42.2 million in 2024, then dropped by 3.32% to $40.8 million in 2025.
  • Business Quant data shows Construction in Progress for TPR at $40.8 million in Q2 2025, $42.2 million in Q2 2024, and $14.3 million in Q3 2023.