KPIs & Operating Metrics(New)
Growth Metrics

Crocs (CROX) Construction in Progress (2016 - 2020)

Crocs has reported Construction in Progress over the past 10 years, most recently at $8.2 million for Q4 2020.

  • Quarterly results put Construction in Progress at $8.2 million for Q4 2020, up 121.45% from a year ago — trailing twelve months through Dec 2020 was $8.2 million (up 121.45% YoY), and the annual figure for FY2020 was $8.2 million, up 121.45%.
  • Construction in Progress for Q4 2020 was $8.2 million at Crocs, up from $3.7 million in the prior quarter.
  • Over the last five years, Construction in Progress for CROX hit a ceiling of $8.2 million in Q4 2020 and a floor of $992000.0 in Q4 2017.
  • Median Construction in Progress over the past 5 years was $3.7 million (2019), compared with a mean of $4.5 million.
  • Biggest five-year swings in Construction in Progress: tumbled 85.43% in 2017 and later soared 165.32% in 2018.
  • Crocs' Construction in Progress stood at $6.8 million in 2016, then tumbled by 85.43% to $992000.0 in 2017, then soared by 165.32% to $2.6 million in 2018, then skyrocketed by 40.46% to $3.7 million in 2019, then surged by 121.45% to $8.2 million in 2020.
  • The last three reported values for Construction in Progress were $8.2 million (Q4 2020), $3.7 million (Q4 2019), and $2.6 million (Q4 2018) per Business Quant data.