KPIs & Operating Metrics(New)
Growth Metrics

Crocs (CROX) Construction in Progress (2016 - 2020)

Crocs' Construction in Progress history spans 10 years, with the latest figure at $8.2 million for Q4 2020.

  • Quarterly Construction in Progress rose 121.45% to $8.2 million in Q4 2020 from the year-ago period, while the trailing twelve-month figure was $8.2 million through Dec 2020, up 121.45% year-over-year, with the annual reading at $8.2 million for FY2020, 121.45% up from the prior year.
  • Construction in Progress came in at $8.2 million for Q4 2020, up from $3.7 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $8.2 million in Q4 2020 to a low of $992000.0 in Q4 2017.
  • The 5-year median for Construction in Progress is $3.7 million (2019), against an average of $4.5 million.
  • Year-over-year, Construction in Progress tumbled 85.43% in 2017 and then soared 165.32% in 2018.
  • Crocs' Construction in Progress stood at $6.8 million in 2016, then crashed by 85.43% to $992000.0 in 2017, then skyrocketed by 165.32% to $2.6 million in 2018, then surged by 40.46% to $3.7 million in 2019, then soared by 121.45% to $8.2 million in 2020.
  • Per Business Quant, the three most recent readings for CROX's Construction in Progress are $8.2 million (Q4 2020), $3.7 million (Q4 2019), and $2.6 million (Q4 2018).