Growth Metrics

Pinnacle West Capital (PNW) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Pinnacle West Capital (PNW) over the last 17 years, with Q3 2025 value amounting to $2.3 billion.

  • Pinnacle West Capital's Construction in Progress rose 3558.68% to $2.3 billion in Q3 2025 from the same period last year, while for Sep 2025 it was $2.3 billion, marking a year-over-year increase of 3558.68%. This contributed to the annual value of $1.6 billion for FY2024, which is 761.86% down from last year.
  • Latest data reveals that Pinnacle West Capital reported Construction in Progress of $2.3 billion as of Q3 2025, which was up 3558.68% from $2.1 billion recorded in Q2 2025.
  • Pinnacle West Capital's Construction in Progress' 5-year high stood at $2.3 billion during Q3 2025, with a 5-year trough of $1.1 billion in Q1 2021.
  • Its 5-year average for Construction in Progress is $1.6 billion, with a median of $1.6 billion in 2024.
  • Per our database at Business Quant, Pinnacle West Capital's Construction in Progress skyrocketed by 4819.28% in 2023 and then plummeted by 1981.44% in 2024.
  • Pinnacle West Capital's Construction in Progress (Quarter) stood at $1.3 billion in 2021, then skyrocketed by 41.62% to $1.9 billion in 2022, then dropped by 8.43% to $1.7 billion in 2023, then dropped by 7.62% to $1.6 billion in 2024, then soared by 45.86% to $2.3 billion in 2025.
  • Its Construction in Progress was $2.3 billion in Q3 2025, compared to $2.1 billion in Q2 2025 and $1.9 billion in Q1 2025.