Nomad Foods (NOMD) Construction in Progress (2018 - 2025)

Nomad Foods (NOMD) has disclosed Construction in Progress for 8 consecutive years, with $44.8 million as the latest value for Q4 2025.

  • Quarterly Construction in Progress rose 54.19% to $44.8 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $44.8 million through Dec 2025, up 54.19% year-over-year, with the annual reading at $44.8 million for FY2025, 54.19% up from the prior year.
  • Construction in Progress for Q4 2025 was $44.8 million at Nomad Foods, up from $29.1 million in the prior quarter.
  • The five-year high for Construction in Progress was $47.2 million in Q4 2023, with the low at $29.1 million in Q4 2024.
  • Average Construction in Progress over 5 years is $39.8 million, with a median of $44.8 million recorded in 2025.
  • The sharpest move saw Construction in Progress soared 58.61% in 2021, then tumbled 38.46% in 2024.
  • Over 5 years, Construction in Progress stood at $46.3 million in 2021, then plummeted by 31.74% to $31.6 million in 2022, then soared by 49.34% to $47.2 million in 2023, then crashed by 38.46% to $29.1 million in 2024, then soared by 54.19% to $44.8 million in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $44.8 million, $29.1 million, and $47.2 million for Q4 2025, Q4 2024, and Q4 2023 respectively.