Growth Metrics

Nomad Foods (NOMD) Construction in Progress (2018 - 2024)

Historic Construction in Progress for Nomad Foods (NOMD) over the last 7 years, with Q4 2024 value amounting to $29.1 million.

  • Nomad Foods' Construction in Progress fell 3846.39% to $29.1 million in Q4 2024 from the same period last year, while for Dec 2024 it was $29.1 million, marking a year-over-year decrease of 3846.39%. This contributed to the annual value of $29.4 million for FY2024, which is 3800.55% down from last year.
  • Per Nomad Foods' latest filing, its Construction in Progress stood at $29.1 million for Q4 2024, which was down 3846.39% from $47.2 million recorded in Q4 2023.
  • In the past 5 years, Nomad Foods' Construction in Progress ranged from a high of $47.2 million in Q4 2023 and a low of $29.1 million during Q4 2024
  • Over the past 5 years, Nomad Foods' median Construction in Progress value was $31.6 million (recorded in 2022), while the average stood at $36.7 million.
  • As far as peak fluctuations go, Nomad Foods' Construction in Progress soared by 10145.27% in 2020, and later crashed by 3846.39% in 2024.
  • Quarter analysis of 5 years shows Nomad Foods' Construction in Progress stood at $29.2 million in 2020, then surged by 58.61% to $46.3 million in 2021, then crashed by 31.74% to $31.6 million in 2022, then surged by 49.34% to $47.2 million in 2023, then plummeted by 38.46% to $29.1 million in 2024.
  • Its last three reported values are $29.1 million in Q4 2024, $47.2 million for Q4 2023, and $31.6 million during Q4 2022.