Nomad Foods (NOMD) Construction in Progress (2018 - 2025)
Nomad Foods (NOMD) has disclosed Construction in Progress for 8 consecutive years, with $44.8 million as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress rose 54.19% to $44.8 million in Q4 2025 year-over-year; TTM through Dec 2025 was $44.8 million, a 54.19% increase, with the full-year FY2025 number at $44.8 million, up 54.19% from a year prior.
- Construction in Progress was $44.8 million for Q4 2025 at Nomad Foods, up from $29.1 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $47.2 million in Q4 2023 to a low of $29.1 million in Q4 2024.
- A 5-year average of $39.8 million and a median of $44.8 million in 2025 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: soared 58.61% in 2021, then crashed 38.46% in 2024.
- Nomad Foods' Construction in Progress stood at $46.3 million in 2021, then crashed by 31.74% to $31.6 million in 2022, then soared by 49.34% to $47.2 million in 2023, then plummeted by 38.46% to $29.1 million in 2024, then skyrocketed by 54.19% to $44.8 million in 2025.
- Per Business Quant, the three most recent readings for NOMD's Construction in Progress are $44.8 million (Q4 2025), $29.1 million (Q4 2024), and $47.2 million (Q4 2023).