ENDRA Life Sciences (NDRA) Construction in Progress (2019 - 2020)
Historic Construction in Progress for ENDRA Life Sciences (NDRA) over the last 2 years, with Q4 2020 value amounting to $79207.0.
- ENDRA Life Sciences' Construction in Progress rose 8168.41% to $79207.0 in Q4 2020 from the same period last year, while for Dec 2020 it was $79207.0, marking a year-over-year increase of 8168.41%. This contributed to the annual value of $79207.0 for FY2020, which is 8168.41% up from last year.
- Per ENDRA Life Sciences' latest filing, its Construction in Progress stood at $79207.0 for Q4 2020, which was up 8168.41% from $43596.0 recorded in Q4 2019.
- Over the past 5 years, ENDRA Life Sciences' Construction in Progress peaked at $79207.0 during Q4 2020, and registered a low of $43596.0 during Q4 2019.