Marzetti (MZTI) Construction in Progress (2022 - 2025)
Marzetti's Construction in Progress history spans 4 years, with the latest figure at $40.9 million for Q2 2025.
- For Q2 2025, Construction in Progress fell 4.22% year-over-year to $40.9 million; the TTM value through Jun 2025 reached $40.9 million, down 4.22%, while the annual FY2025 figure was $40.9 million, 4.22% down from the prior year.
- Construction in Progress reached $40.9 million in Q2 2025 per MZTI's latest filing, down from $42.7 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $139.0 million in Q2 2022 to a low of $40.9 million in Q2 2025.
- Average Construction in Progress over 4 years is $66.3 million, with a median of $42.7 million recorded in 2023.
- Peak YoY movement for Construction in Progress: plummeted 69.31% in 2023, then rose 0.1% in 2024.
- A 4-year view of Construction in Progress shows it stood at $139.0 million in 2022, then tumbled by 69.31% to $42.6 million in 2023, then rose by 0.1% to $42.7 million in 2024, then decreased by 4.22% to $40.9 million in 2025.
- Per Business Quant, the three most recent readings for MZTI's Construction in Progress are $40.9 million (Q2 2025), $42.7 million (Q2 2024), and $42.6 million (Q2 2023).