J&J Snack Foods (JJSF) Construction in Progress (2016 - 2026)
J&J Snack Foods filings provide 14 years of Construction in Progress readings, the most recent being $18.9 million for Q4 2025.
- On a quarterly basis, Construction in Progress fell 44.22% to $18.9 million in Q4 2025 year-over-year; TTM through Dec 2025 was $18.9 million, a 44.22% decrease, with the full-year FY2025 number at $13.9 million, down 51.39% from a year prior.
- Construction in Progress hit $18.9 million in Q4 2025 for J&J Snack Foods, up from $13.9 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $80.5 million in Q4 2022 to a low of $12.8 million in Q2 2025.
- Median Construction in Progress over the past 5 years was $35.7 million (2021), compared with a mean of $40.6 million.
- Biggest five-year swings in Construction in Progress: surged 133.67% in 2021 and later crashed 61.98% in 2024.
- J&J Snack Foods' Construction in Progress stood at $43.3 million in 2021, then skyrocketed by 86.01% to $80.5 million in 2022, then crashed by 46.75% to $42.8 million in 2023, then dropped by 20.77% to $33.9 million in 2024, then crashed by 44.22% to $18.9 million in 2025.
- The last three reported values for Construction in Progress were $18.9 million (Q4 2025), $13.9 million (Q3 2025), and $12.8 million (Q2 2025) per Business Quant data.