Growth Metrics

J&J Snack Foods (JJSF) Construction in Progress (2016 - 2025)

Historic Construction in Progress for J&J Snack Foods (JJSF) over the last 14 years, with Q4 2025 value amounting to $18.9 million.

  • J&J Snack Foods' Construction in Progress fell 4421.92% to $18.9 million in Q4 2025 from the same period last year, while for Dec 2025 it was $18.9 million, marking a year-over-year decrease of 4421.92%. This contributed to the annual value of $13.9 million for FY2025, which is 5138.85% down from last year.
  • According to the latest figures from Q4 2025, J&J Snack Foods' Construction in Progress is $18.9 million, which was down 4421.92% from $13.9 million recorded in Q3 2025.
  • In the past 5 years, J&J Snack Foods' Construction in Progress ranged from a high of $80.5 million in Q4 2022 and a low of $12.8 million during Q2 2025
  • Its 5-year average for Construction in Progress is $40.6 million, with a median of $35.7 million in 2021.
  • Its Construction in Progress has fluctuated over the past 5 years, first surged by 13367.16% in 2021, then tumbled by 6197.62% in 2024.
  • Over the past 5 years, J&J Snack Foods' Construction in Progress (Quarter) stood at $43.3 million in 2021, then surged by 86.01% to $80.5 million in 2022, then tumbled by 46.75% to $42.8 million in 2023, then fell by 20.77% to $33.9 million in 2024, then tumbled by 44.22% to $18.9 million in 2025.
  • Its last three reported values are $18.9 million in Q4 2025, $13.9 million for Q3 2025, and $12.8 million during Q2 2025.