Growth Metrics

J&J Snack Foods (JJSF) Construction in Progress (2016 - 2025)

J&J Snack Foods' Construction in Progress history spans 14 years, with the latest figure at $18.9 million for Q4 2025.

  • For the quarter ending Q4 2025, Construction in Progress fell 44.22% year-over-year to $18.9 million, compared with a TTM value of $18.9 million through Dec 2025, down 44.22%, and an annual FY2025 reading of $13.9 million, down 51.39% over the prior year.
  • Construction in Progress for Q4 2025 was $18.9 million at J&J Snack Foods, up from $13.9 million in the prior quarter.
  • The five-year high for Construction in Progress was $80.5 million in Q4 2022, with the low at $12.8 million in Q2 2025.
  • Average Construction in Progress over 5 years is $40.6 million, with a median of $35.7 million recorded in 2021.
  • Year-over-year, Construction in Progress surged 133.67% in 2021 and then crashed 61.98% in 2024.
  • Tracing JJSF's Construction in Progress over 5 years: stood at $43.3 million in 2021, then skyrocketed by 86.01% to $80.5 million in 2022, then crashed by 46.75% to $42.8 million in 2023, then dropped by 20.77% to $33.9 million in 2024, then crashed by 44.22% to $18.9 million in 2025.
  • Per Business Quant, the three most recent readings for JJSF's Construction in Progress are $18.9 million (Q4 2025), $13.9 million (Q3 2025), and $12.8 million (Q2 2025).