Growth Metrics

Icu Medical (ICUI) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Icu Medical (ICUI) over the last 11 years, with Q3 2025 value amounting to $89.8 million.

  • Icu Medical's Construction in Progress fell 1917.86% to $89.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $89.8 million, marking a year-over-year decrease of 1917.86%. This contributed to the annual value of $87.0 million for FY2024, which is 2577.48% down from last year.
  • Icu Medical's Construction in Progress amounted to $89.8 million in Q3 2025, which was down 1917.86% from $88.7 million recorded in Q2 2025.
  • Icu Medical's 5-year Construction in Progress high stood at $152.9 million for Q4 2022, and its period low was $55.8 million during Q1 2021.
  • In the last 5 years, Icu Medical's Construction in Progress had a median value of $106.1 million in 2023 and averaged $104.0 million.
  • As far as peak fluctuations go, Icu Medical's Construction in Progress plummeted by 2803.97% in 2021, and later soared by 13881.75% in 2022.
  • Quarter analysis of 5 years shows Icu Medical's Construction in Progress stood at $72.2 million in 2021, then skyrocketed by 111.92% to $152.9 million in 2022, then decreased by 23.34% to $117.2 million in 2023, then decreased by 25.77% to $87.0 million in 2024, then grew by 3.18% to $89.8 million in 2025.
  • Its last three reported values are $89.8 million in Q3 2025, $88.7 million for Q2 2025, and $84.8 million during Q1 2025.