Growth Metrics

Icu Medical (ICUI) Construction in Progress (2016 - 2025)

Icu Medical's Construction in Progress history spans 11 years, with the latest figure at $89.8 million for Q3 2025.

  • For the quarter ending Q3 2025, Construction in Progress fell 19.18% year-over-year to $89.8 million, compared with a TTM value of $89.8 million through Sep 2025, down 19.18%, and an annual FY2024 reading of $87.0 million, down 25.77% over the prior year.
  • Construction in Progress for Q3 2025 was $89.8 million at Icu Medical, up from $88.7 million in the prior quarter.
  • The five-year high for Construction in Progress was $152.9 million in Q4 2022, with the low at $55.8 million in Q1 2021.
  • Average Construction in Progress over 5 years is $104.0 million, with a median of $106.1 million recorded in 2023.
  • Year-over-year, Construction in Progress dropped 28.04% in 2021 and then soared 138.82% in 2022.
  • Tracing ICUI's Construction in Progress over 5 years: stood at $72.2 million in 2021, then soared by 111.92% to $152.9 million in 2022, then dropped by 23.34% to $117.2 million in 2023, then fell by 25.77% to $87.0 million in 2024, then rose by 3.18% to $89.8 million in 2025.
  • Per Business Quant, the three most recent readings for ICUI's Construction in Progress are $89.8 million (Q3 2025), $88.7 million (Q2 2025), and $84.8 million (Q1 2025).