Entergy Arkansas (EAI) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Entergy Arkansas (EAI) over the last 17 years, with Q3 2025 value amounting to $5.8 billion.

  • Entergy Arkansas' Construction in Progress rose 6700.07% to $5.8 billion in Q3 2025 from the same period last year, while for Sep 2025 it was $5.8 billion, marking a year-over-year increase of 6700.07%. This contributed to the annual value of $3.2 billion for FY2024, which is 5195.77% up from last year.
  • Per Entergy Arkansas' latest filing, its Construction in Progress stood at $5.8 billion for Q3 2025, which was up 6700.07% from $5.0 billion recorded in Q2 2025.
  • Over the past 5 years, Entergy Arkansas' Construction in Progress peaked at $5.8 billion during Q3 2025, and registered a low of $1.3 billion during Q1 2021.
  • In the last 5 years, Entergy Arkansas' Construction in Progress had a median value of $2.2 billion in 2023 and averaged $2.6 billion.
  • Its Construction in Progress has fluctuated over the past 5 years, first plummeted by 4686.4% in 2021, then skyrocketed by 9378.92% in 2025.
  • Quarter analysis of 5 years shows Entergy Arkansas' Construction in Progress stood at $1.5 billion in 2021, then rose by 21.97% to $1.8 billion in 2022, then increased by 14.41% to $2.1 billion in 2023, then surged by 51.96% to $3.2 billion in 2024, then soared by 81.05% to $5.8 billion in 2025.
  • Its last three reported values are $5.8 billion in Q3 2025, $5.0 billion for Q2 2025, and $4.4 billion during Q1 2025.