Growth Metrics

Duluth Holdings (DLTH) Construction in Progress (2018 - 2025)

Historic Construction in Progress for Duluth Holdings (DLTH) over the last 8 years, with Q4 2025 value amounting to $1.2 million.

  • Duluth Holdings' Construction in Progress fell 4194.17% to $1.2 million in Q4 2025 from the same period last year, while for Nov 2025 it was $1.2 million, marking a year-over-year decrease of 4194.17%. This contributed to the annual value of $2.9 million for FY2025, which is 2388.26% down from last year.
  • According to the latest figures from Q4 2025, Duluth Holdings' Construction in Progress is $1.2 million, which was down 4194.17% from $3.3 million recorded in Q3 2025.
  • In the past 5 years, Duluth Holdings' Construction in Progress registered a high of $34.5 million during Q3 2023, and its lowest value of $1.2 million during Q4 2025.
  • Over the past 5 years, Duluth Holdings' median Construction in Progress value was $3.3 million (recorded in 2025), while the average stood at $8.7 million.
  • As far as peak fluctuations go, Duluth Holdings' Construction in Progress skyrocketed by 35309.67% in 2023, and later tumbled by 9470.61% in 2024.
  • Duluth Holdings' Construction in Progress (Quarter) stood at $1.6 million in 2021, then skyrocketed by 787.74% to $14.1 million in 2022, then tumbled by 84.96% to $2.1 million in 2023, then decreased by 2.97% to $2.1 million in 2024, then crashed by 41.94% to $1.2 million in 2025.
  • Its Construction in Progress stands at $1.2 million for Q4 2025, versus $3.3 million for Q3 2025 and $2.1 million for Q2 2025.