Growth Metrics

Duluth Holdings (DLTH) Construction in Progress (2018 - 2026)

Duluth Holdings (DLTH) has disclosed Construction in Progress for 8 consecutive years, with $1.2 million as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 41.94% to $1.2 million in Q4 2025 year-over-year; TTM through Nov 2025 was $1.2 million, a 41.94% decrease, with the full-year FY2025 number at $2.9 million, down 23.88% from a year prior.
  • Construction in Progress was $1.2 million for Q4 2025 at Duluth Holdings, down from $3.3 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $34.5 million in Q3 2023 to a low of $1.2 million in Q4 2025.
  • A 5-year average of $8.7 million and a median of $3.3 million in 2025 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: surged 353.1% in 2023, then plummeted 94.71% in 2024.
  • Duluth Holdings' Construction in Progress stood at $1.6 million in 2021, then soared by 787.74% to $14.1 million in 2022, then plummeted by 84.96% to $2.1 million in 2023, then fell by 2.97% to $2.1 million in 2024, then crashed by 41.94% to $1.2 million in 2025.
  • Per Business Quant, the three most recent readings for DLTH's Construction in Progress are $1.2 million (Q4 2025), $3.3 million (Q3 2025), and $2.1 million (Q2 2025).