Duluth Holdings (DLTH) Construction in Progress (2018 - 2026)
Duluth Holdings (DLTH) has disclosed Construction in Progress for 9 consecutive years, with $2.6 million as the latest value for Q1 2026.
- Quarterly Construction in Progress fell 11.01% to $2.6 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $2.6 million through Feb 2026, down 11.01% year-over-year, with the annual reading at $2.6 million for FY2026, 11.01% down from the prior year.
- Construction in Progress for Q1 2026 was $2.6 million at Duluth Holdings, up from $1.2 million in the prior quarter.
- The five-year high for Construction in Progress was $34.5 million in Q3 2023, with the low at $1.2 million in Q4 2025.
- Average Construction in Progress over 5 years is $8.8 million, with a median of $3.3 million recorded in 2025.
- The sharpest move saw Construction in Progress soared 353.1% in 2023, then tumbled 94.71% in 2024.
- Over 5 years, Construction in Progress stood at $14.1 million in 2022, then tumbled by 84.96% to $2.1 million in 2023, then dropped by 2.97% to $2.1 million in 2024, then plummeted by 41.94% to $1.2 million in 2025, then soared by 114.13% to $2.6 million in 2026.
- According to Business Quant data, Construction in Progress over the past three periods came in at $2.6 million, $1.2 million, and $3.3 million for Q1 2026, Q4 2025, and Q3 2025 respectively.