Duluth Holdings (DLTH) Construction in Progress (2018 - 2025)
Historic Construction in Progress for Duluth Holdings (DLTH) over the last 8 years, with Q4 2025 value amounting to $1.2 million.
- Duluth Holdings' Construction in Progress fell 4194.17% to $1.2 million in Q4 2025 from the same period last year, while for Nov 2025 it was $1.2 million, marking a year-over-year decrease of 4194.17%. This contributed to the annual value of $2.9 million for FY2025, which is 2388.26% down from last year.
- Latest data reveals that Duluth Holdings reported Construction in Progress of $1.2 million as of Q4 2025, which was down 4194.17% from $3.3 million recorded in Q3 2025.
- Duluth Holdings' Construction in Progress' 5-year high stood at $34.5 million during Q3 2023, with a 5-year trough of $1.2 million in Q4 2025.
- Moreover, its 5-year median value for Construction in Progress was $3.3 million (2025), whereas its average is $8.7 million.
- Its Construction in Progress has fluctuated over the past 5 years, first soared by 35309.67% in 2023, then plummeted by 9470.61% in 2024.
- Duluth Holdings' Construction in Progress (Quarter) stood at $1.6 million in 2021, then soared by 787.74% to $14.1 million in 2022, then plummeted by 84.96% to $2.1 million in 2023, then dropped by 2.97% to $2.1 million in 2024, then tumbled by 41.94% to $1.2 million in 2025.
- Its Construction in Progress was $1.2 million in Q4 2025, compared to $3.3 million in Q3 2025 and $2.1 million in Q2 2025.