Growth Metrics

Duluth Holdings (DLTH) Construction in Progress (2018 - 2026)

Duluth Holdings has reported Construction in Progress over the past 8 years, most recently at $2.6 million for Q1 2026.

  • Quarterly Construction in Progress fell 11.01% to $2.6 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $2.6 million through Feb 2026, down 11.01% year-over-year, with the annual reading at $2.6 million for FY2026, 11.01% down from the prior year.
  • Construction in Progress was $2.6 million for Q1 2026 at Duluth Holdings, up from $1.2 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $34.5 million in Q3 2023 and troughed at $1.2 million in Q4 2025.
  • The 5-year median for Construction in Progress is $3.3 million (2025), against an average of $8.8 million.
  • Year-over-year, Construction in Progress surged 353.1% in 2023 and then plummeted 94.71% in 2024.
  • A 5-year view of Construction in Progress shows it stood at $14.1 million in 2022, then crashed by 84.96% to $2.1 million in 2023, then decreased by 2.97% to $2.1 million in 2024, then tumbled by 41.94% to $1.2 million in 2025, then skyrocketed by 114.13% to $2.6 million in 2026.
  • Per Business Quant, the three most recent readings for DLTH's Construction in Progress are $2.6 million (Q1 2026), $1.2 million (Q4 2025), and $3.3 million (Q3 2025).