Bridgford Foods (BRID) Construction in Progress (2016 - 2020)
Bridgford Foods has reported Construction in Progress over the past 7 years, most recently at $1.4 million for Q4 2020.
- Quarterly Construction in Progress fell 90.25% to $1.4 million in Q4 2020 from the year-ago period, while the trailing twelve-month figure was $1.4 million through Oct 2020, down 90.25% year-over-year, with the annual reading at $1.4 million for FY2020, 90.25% down from the prior year.
- Construction in Progress was $1.4 million for Q4 2020 at Bridgford Foods, down from $13.9 million in the prior quarter.
- Over five years, Construction in Progress peaked at $13.9 million in Q4 2019 and troughed at $648000.0 in Q4 2017.
- The 5-year median for Construction in Progress is $1.4 million (2020), against an average of $5.1 million.
- Year-over-year, Construction in Progress surged 1200.0% in 2018 and then tumbled 90.25% in 2020.
- A 5-year view of Construction in Progress shows it stood at $1.1 million in 2016, then crashed by 39.89% to $648000.0 in 2017, then surged by 1200.0% to $8.4 million in 2018, then soared by 65.34% to $13.9 million in 2019, then tumbled by 90.25% to $1.4 million in 2020.
- Per Business Quant, the three most recent readings for BRID's Construction in Progress are $1.4 million (Q4 2020), $13.9 million (Q4 2019), and $8.4 million (Q4 2018).