Growth Metrics

Birchtech (BCHT) Construction in Progress (2016)

Birchtech (BCHT) has disclosed Construction in Progress for 2 consecutive years, with $851166.0 as the latest value for Q3 2016.

  • Quarterly Construction in Progress changed N/A to $851166.0 in Q3 2016 from the year-ago period, while the trailing twelve-month figure was $851166.0 through Sep 2016, changed N/A year-over-year, with the annual reading at $314014.0 for FY2015, N/A changed from the prior year.
  • Construction in Progress hit $851166.0 in Q3 2016 for Birchtech, up from $744501.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $851166.0 in Q3 2016 to a low of $314014.0 in Q4 2015.