Euro Tech Holdings (CLWT) Construction in Progress (2016)

Euro Tech Holdings (CLWT) has disclosed Construction in Progress for 3 consecutive years, with $30925.2 as the latest value for Q4 2016.

  • Quarterly Construction in Progress changed N/A to $30925.2 in Q4 2016 from the year-ago period, while the trailing twelve-month figure was $30925.2 through Dec 2016, changed N/A year-over-year, with the annual reading at $30925.2 for FY2016, N/A changed from the prior year.
  • Construction in Progress for Q4 2016 was $30925.2 at Euro Tech Holdings, down from $18.8 million in the prior quarter.
  • The five-year high for Construction in Progress was $18.8 million in Q4 2014, with the low at $30925.2 in Q4 2016.
  • Average Construction in Progress over 3 years is $6.3 million, with a median of $47685.8 recorded in 2012.