Growth Metrics

Weyco (WEYS) Construction in Progress (2016 - 2025)

Weyco (WEYS) has disclosed Construction in Progress for 15 consecutive years, with $637000.0 as the latest value for Q4 2025.

  • Quarterly Construction in Progress fell 34.4% to $637000.0 in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $637000.0 through Dec 2025, down 34.4% year-over-year, with the annual reading at $637000.0 for FY2025, 34.4% down from the prior year.
  • Construction in Progress for Q4 2025 was $637000.0 at Weyco, down from $971000.0 in the prior quarter.
  • The five-year high for Construction in Progress was $2.0 million in Q4 2023, with the low at $322000.0 in Q4 2022.
  • Average Construction in Progress over 5 years is $920600.0, with a median of $701000.0 recorded in 2021.
  • The sharpest move saw Construction in Progress plummeted 54.07% in 2022, then surged 512.42% in 2023.
  • Over 5 years, Construction in Progress stood at $701000.0 in 2021, then tumbled by 54.07% to $322000.0 in 2022, then soared by 512.42% to $2.0 million in 2023, then plummeted by 50.76% to $971000.0 in 2024, then tumbled by 34.4% to $637000.0 in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $637000.0, $971000.0, and $2.0 million for Q4 2025, Q4 2024, and Q4 2023 respectively.