Growth Metrics

Weyco (WEYS) Construction in Progress (2016 - 2025)

Weyco (WEYS) has 15 years of Construction in Progress data on record, last reported at $637000.0 in Q4 2025.

  • On a quarterly basis, Construction in Progress fell 34.4% to $637000.0 in Q4 2025 year-over-year; TTM through Dec 2025 was $637000.0, a 34.4% decrease, with the full-year FY2025 number at $637000.0, down 34.4% from a year prior.
  • Construction in Progress reached $637000.0 in Q4 2025 per WEYS's latest filing, down from $971000.0 in the prior quarter.
  • Over the last five years, Construction in Progress for WEYS hit a ceiling of $2.0 million in Q4 2023 and a floor of $322000.0 in Q4 2022.
  • A 5-year average of $920600.0 and a median of $701000.0 in 2021 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: tumbled 54.07% in 2022, then soared 512.42% in 2023.
  • Tracing WEYS's Construction in Progress over 5 years: stood at $701000.0 in 2021, then crashed by 54.07% to $322000.0 in 2022, then skyrocketed by 512.42% to $2.0 million in 2023, then tumbled by 50.76% to $971000.0 in 2024, then crashed by 34.4% to $637000.0 in 2025.
  • Business Quant data shows Construction in Progress for WEYS at $637000.0 in Q4 2025, $971000.0 in Q4 2024, and $2.0 million in Q4 2023.