Weyco (WEYS) Construction in Progress (2016 - 2025)
Weyco (WEYS) has disclosed Construction in Progress for 14 consecutive years, with $971000.0 as the latest value for Q4 2024.
- On a quarterly basis, Construction in Progress fell 50.76% to $971000.0 in Q4 2024 year-over-year; TTM through Dec 2024 was $971000.0, a 50.76% decrease, with the full-year FY2024 number at $971000.0, down 50.76% from a year prior.
- Construction in Progress was $971000.0 for Q4 2024 at Weyco, down from $2.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $2.0 million in Q4 2023 to a low of $322000.0 in Q4 2022.
- A 5-year average of $920600.0 and a median of $701000.0 in 2021 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: tumbled 87.92% in 2020, then skyrocketed 512.42% in 2023.
- Weyco's Construction in Progress stood at $637000.0 in 2020, then increased by 10.05% to $701000.0 in 2021, then plummeted by 54.07% to $322000.0 in 2022, then surged by 512.42% to $2.0 million in 2023, then crashed by 50.76% to $971000.0 in 2024.
- Per Business Quant, the three most recent readings for WEYS's Construction in Progress are $971000.0 (Q4 2024), $2.0 million (Q4 2023), and $322000.0 (Q4 2022).