Growth Metrics

Vince Holding (VNCE) Construction in Progress: 2013-2016

  • Vince Holding's Construction in Progress rose 39.98% to $4.7 million in Q1 2016 from the same period last year, while for Jan 2016 it was $4.7 million, marking a year-over-year increase of 39.98%. This contributed to the annual value of $4.7 million for FY2016, which is 39.98% up from last year.
  • Per Vince Holding's latest filing, its Construction in Progress stood at $4.7 million for Q1 2016, which was up 39.98% from $3.4 million recorded in Q1 2015.
  • Vince Holding's Construction in Progress' 5-year high stood at $4.7 million during Q1 2016, with a 5-year trough of $219,000 in Q1 2013.
  • Over the past 3 years, Vince Holding's median Construction in Progress value was $3.4 million (recorded in 2015), while the average stood at $3.1 million.
  • Data for Vince Holding's Construction in Progress shows a peak YoY skyrocketed of 447.95% (in 2014) over the last 5 years.
  • Vince Holding's Construction in Progress (Quarterly) stood at $219,000 in 2013, then soared by 447.95% to $1.2 million in 2014, then skyrocketed by 180.75% to $3.4 million in 2015, then skyrocketed by 39.98% to $4.7 million in 2016.
  • Its Construction in Progress was $4.7 million in Q1 2016, compared to $3.4 million in Q1 2015 and $1.2 million in Q1 2014.