Marriott Vacations Worldwide (VAC) Construction in Progress (2016 - 2025)
Marriott Vacations Worldwide has reported Construction in Progress over the past 14 years, most recently at $40.0 million for Q4 2025.
- Quarterly results put Construction in Progress at $40.0 million for Q4 2025, down 6.98% from a year ago — trailing twelve months through Dec 2025 was $40.0 million (down 6.98% YoY), and the annual figure for FY2025 was $40.0 million, down 6.98%.
- Construction in Progress for Q4 2025 was $40.0 million at Marriott Vacations Worldwide, down from $43.0 million in the prior quarter.
- Over the last five years, Construction in Progress for VAC hit a ceiling of $91.0 million in Q4 2022 and a floor of $37.0 million in Q4 2021.
- Median Construction in Progress over the past 5 years was $43.0 million (2024), compared with a mean of $52.6 million.
- Biggest five-year swings in Construction in Progress: tumbled 45.59% in 2021 and later surged 145.95% in 2022.
- Marriott Vacations Worldwide's Construction in Progress stood at $37.0 million in 2021, then skyrocketed by 145.95% to $91.0 million in 2022, then crashed by 42.86% to $52.0 million in 2023, then decreased by 17.31% to $43.0 million in 2024, then fell by 6.98% to $40.0 million in 2025.
- The last three reported values for Construction in Progress were $40.0 million (Q4 2025), $43.0 million (Q4 2024), and $52.0 million (Q4 2023) per Business Quant data.