KPIs & Operating Metrics(New)
Growth Metrics

Hilton Worldwide Holdings (HLT) Construction in Progress (2016 - 2025)

Hilton Worldwide Holdings (HLT) has disclosed Construction in Progress for 13 consecutive years, with $57.0 million as the latest value for Q4 2025.

  • Quarterly Construction in Progress fell 12.31% to $57.0 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $57.0 million through Dec 2025, down 12.31% year-over-year, with the annual reading at $57.0 million for FY2025, 12.31% down from the prior year.
  • Construction in Progress for Q4 2025 was $57.0 million at Hilton Worldwide Holdings, down from $65.0 million in the prior quarter.
  • The five-year high for Construction in Progress was $65.0 million in Q4 2024, with the low at $14.0 million in Q4 2021.
  • Average Construction in Progress over 5 years is $39.4 million, with a median of $37.0 million recorded in 2023.
  • The sharpest move saw Construction in Progress surged 100.0% in 2021, then dropped 12.31% in 2025.
  • Over 5 years, Construction in Progress stood at $14.0 million in 2021, then skyrocketed by 71.43% to $24.0 million in 2022, then soared by 54.17% to $37.0 million in 2023, then surged by 75.68% to $65.0 million in 2024, then decreased by 12.31% to $57.0 million in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $57.0 million, $65.0 million, and $37.0 million for Q4 2025, Q4 2024, and Q4 2023 respectively.