KPIs & Operating Metrics(New)
Growth Metrics

Hilton Worldwide Holdings (HLT) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Hilton Worldwide Holdings (HLT) over the last 13 years, with Q4 2025 value amounting to $57.0 million.

  • Hilton Worldwide Holdings' Construction in Progress fell 1230.77% to $57.0 million in Q4 2025 from the same period last year, while for Dec 2025 it was $57.0 million, marking a year-over-year decrease of 1230.77%. This contributed to the annual value of $57.0 million for FY2025, which is 1230.77% down from last year.
  • According to the latest figures from Q4 2025, Hilton Worldwide Holdings' Construction in Progress is $57.0 million, which was down 1230.77% from $65.0 million recorded in Q4 2024.
  • Hilton Worldwide Holdings' Construction in Progress' 5-year high stood at $65.0 million during Q4 2024, with a 5-year trough of $14.0 million in Q4 2021.
  • Moreover, its 5-year median value for Construction in Progress was $37.0 million (2023), whereas its average is $39.4 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first surged by 10000.0% in 2021, then plummeted by 1230.77% in 2025.
  • Over the past 5 years, Hilton Worldwide Holdings' Construction in Progress (Quarter) stood at $14.0 million in 2021, then skyrocketed by 71.43% to $24.0 million in 2022, then skyrocketed by 54.17% to $37.0 million in 2023, then skyrocketed by 75.68% to $65.0 million in 2024, then decreased by 12.31% to $57.0 million in 2025.
  • Its Construction in Progress stands at $57.0 million for Q4 2025, versus $65.0 million for Q4 2024 and $37.0 million for Q4 2023.