KPIs & Operating Metrics(New)
Growth Metrics

Hilton Worldwide Holdings (HLT) Construction in Progress (2016 - 2025)

Hilton Worldwide Holdings (HLT) has disclosed Construction in Progress for 13 consecutive years, with $57.0 million as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 12.31% to $57.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $57.0 million, a 12.31% decrease, with the full-year FY2025 number at $57.0 million, down 12.31% from a year prior.
  • Construction in Progress was $57.0 million for Q4 2025 at Hilton Worldwide Holdings, down from $65.0 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $65.0 million in Q4 2024 to a low of $14.0 million in Q4 2021.
  • A 5-year average of $39.4 million and a median of $37.0 million in 2023 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: skyrocketed 100.0% in 2021, then fell 12.31% in 2025.
  • Hilton Worldwide Holdings' Construction in Progress stood at $14.0 million in 2021, then soared by 71.43% to $24.0 million in 2022, then surged by 54.17% to $37.0 million in 2023, then skyrocketed by 75.68% to $65.0 million in 2024, then dropped by 12.31% to $57.0 million in 2025.
  • Per Business Quant, the three most recent readings for HLT's Construction in Progress are $57.0 million (Q4 2025), $65.0 million (Q4 2024), and $37.0 million (Q4 2023).