H World (HTHT) Construction in Progress (2016 - 2024)
H World (HTHT) has disclosed Construction in Progress for 14 consecutive years, with $15.0 million as the latest value for Q4 2024.
- Quarterly Construction in Progress fell 58.2% to $15.0 million in Q4 2024 from the year-ago period, while the trailing twelve-month figure was $15.0 million through Dec 2024, down 58.2% year-over-year, with the annual reading at $15.0 million for FY2024, 58.2% down from the prior year.
- Construction in Progress for Q4 2024 was $15.0 million at H World, down from $36.0 million in the prior quarter.
- The five-year high for Construction in Progress was $121.7 million in Q4 2021, with the low at $15.0 million in Q4 2024.
- Average Construction in Progress over 5 years is $59.5 million, with a median of $36.0 million recorded in 2023.
- The sharpest move saw Construction in Progress tumbled 77.7% in 2022, then skyrocketed 32.56% in 2023.
- Over 5 years, Construction in Progress stood at $97.8 million in 2020, then rose by 24.45% to $121.7 million in 2021, then tumbled by 77.7% to $27.1 million in 2022, then surged by 32.56% to $36.0 million in 2023, then plummeted by 58.2% to $15.0 million in 2024.
- According to Business Quant data, Construction in Progress over the past three periods came in at $15.0 million, $36.0 million, and $27.1 million for Q4 2024, Q4 2023, and Q4 2022 respectively.