Viking Holdings (VIK) Construction in Progress (2023 - 2025)

Viking Holdings (VIK) has disclosed Construction in Progress for 3 consecutive years, with $620.6 million as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 124.94% to $620.6 million in Q4 2025 year-over-year; TTM through Dec 2025 was $620.6 million, a 124.94% increase, with the full-year FY2025 number at $620.6 million, up 124.94% from a year prior.
  • Construction in Progress was $620.6 million for Q4 2025 at Viking Holdings, up from $275.9 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $620.6 million in Q4 2025 to a low of $102.5 million in Q4 2023.
  • A 3-year average of $333.0 million and a median of $275.9 million in 2024 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: soared 169.17% in 2024, then skyrocketed 124.94% in 2025.
  • Viking Holdings' Construction in Progress stood at $102.5 million in 2023, then soared by 169.17% to $275.9 million in 2024, then surged by 124.94% to $620.6 million in 2025.
  • Per Business Quant, the three most recent readings for VIK's Construction in Progress are $620.6 million (Q4 2025), $275.9 million (Q4 2024), and $102.5 million (Q4 2023).