Travel & Leisure (TNL) Construction in Progress (2016 - 2025)
Travel & Leisure has reported Construction in Progress over the past 16 years, most recently at $7.0 million for Q4 2025.
- Quarterly Construction in Progress rose 40.0% to $7.0 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $7.0 million through Dec 2025, up 40.0% year-over-year, with the annual reading at $7.0 million for FY2025, 40.0% up from the prior year.
- Construction in Progress was $7.0 million for Q4 2025 at Travel & Leisure, up from $5.0 million in the prior quarter.
- Over five years, Construction in Progress peaked at $7.0 million in Q4 2025 and troughed at $1.0 million in Q4 2021.
- The 5-year median for Construction in Progress is $5.0 million (2023), against an average of $4.4 million.
- Biggest five-year swings in Construction in Progress: tumbled 66.67% in 2021 and later surged 300.0% in 2022.
- Tracing TNL's Construction in Progress over 5 years: stood at $1.0 million in 2021, then surged by 300.0% to $4.0 million in 2022, then grew by 25.0% to $5.0 million in 2023, then changed by 0.0% to $5.0 million in 2024, then surged by 40.0% to $7.0 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $7.0 million, $5.0 million, and $5.0 million for Q4 2025, Q4 2024, and Q4 2023 respectively.