Growth Metrics

Travel & Leisure (TNL) Construction in Progress (2016 - 2025)

Travel & Leisure has reported Construction in Progress over the past 16 years, most recently at $7.0 million for Q4 2025.

  • For Q4 2025, Construction in Progress rose 40.0% year-over-year to $7.0 million; the TTM value through Dec 2025 reached $7.0 million, up 40.0%, while the annual FY2025 figure was $7.0 million, 40.0% up from the prior year.
  • Construction in Progress for Q4 2025 was $7.0 million at Travel & Leisure, up from $5.0 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $7.0 million in Q4 2025 and troughed at $1.0 million in Q4 2021.
  • A 5-year average of $4.4 million and a median of $5.0 million in 2023 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: plummeted 66.67% in 2021 and later skyrocketed 300.0% in 2022.
  • Year by year, Construction in Progress stood at $1.0 million in 2021, then skyrocketed by 300.0% to $4.0 million in 2022, then rose by 25.0% to $5.0 million in 2023, then changed by 0.0% to $5.0 million in 2024, then skyrocketed by 40.0% to $7.0 million in 2025.
  • Business Quant data shows Construction in Progress for TNL at $7.0 million in Q4 2025, $5.0 million in Q4 2024, and $5.0 million in Q4 2023.