Alpha Teknova (TKNO) Construction in Progress (2020 - 2025)
Alpha Teknova (TKNO) has disclosed Construction in Progress for 6 consecutive years, with $2.9 million as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress rose 11.17% to $2.9 million in Q4 2025 year-over-year; TTM through Dec 2025 was $2.9 million, a 11.17% increase, with the full-year FY2025 number at $2.9 million, up 11.17% from a year prior.
- Construction in Progress was $2.9 million for Q4 2025 at Alpha Teknova, up from $2.6 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $41.1 million in Q3 2022 to a low of $2.0 million in Q1 2024.
- A 5-year average of $12.8 million and a median of $3.0 million in 2023 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: skyrocketed 825.12% in 2021, then plummeted 92.67% in 2023.
- Alpha Teknova's Construction in Progress stood at $18.8 million in 2021, then rose by 26.02% to $23.7 million in 2022, then tumbled by 91.55% to $2.0 million in 2023, then soared by 30.94% to $2.6 million in 2024, then rose by 11.17% to $2.9 million in 2025.
- Per Business Quant, the three most recent readings for TKNO's Construction in Progress are $2.9 million (Q4 2025), $2.6 million (Q3 2025), and $2.3 million (Q2 2025).