Growth Metrics

Alpha Teknova (TKNO) Construction in Progress (2020 - 2026)

Alpha Teknova has reported Construction in Progress over the past 6 years, most recently at $2.9 million for Q4 2025.

  • Quarterly Construction in Progress rose 11.17% to $2.9 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $2.9 million through Dec 2025, up 11.17% year-over-year, with the annual reading at $2.9 million for FY2025, 11.17% up from the prior year.
  • Construction in Progress was $2.9 million for Q4 2025 at Alpha Teknova, up from $2.6 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $41.1 million in Q3 2022 and troughed at $2.0 million in Q1 2024.
  • The 5-year median for Construction in Progress is $3.0 million (2023), against an average of $12.8 million.
  • Year-over-year, Construction in Progress skyrocketed 825.12% in 2021 and then plummeted 92.67% in 2023.
  • A 5-year view of Construction in Progress shows it stood at $18.8 million in 2021, then increased by 26.02% to $23.7 million in 2022, then plummeted by 91.55% to $2.0 million in 2023, then surged by 30.94% to $2.6 million in 2024, then increased by 11.17% to $2.9 million in 2025.
  • Per Business Quant, the three most recent readings for TKNO's Construction in Progress are $2.9 million (Q4 2025), $2.6 million (Q3 2025), and $2.3 million (Q2 2025).