Cash Flow Statement
Growth Metrics

Teleflex (TFX) Construction in Progress (2016)

Teleflex's Construction in Progress history spans 7 years, with the latest figure at $47.4 million for Q4 2016.

  • For Q4 2016, Construction in Progress rose 3.23% year-over-year to $47.4 million; the TTM value through Dec 2016 reached $47.4 million, up 3.23%, while the annual FY2016 figure was $47.4 million, 3.23% up from the prior year.
  • Construction in Progress reached $47.4 million in Q4 2016 per TFX's latest filing, up from $45.9 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $55.1 million in Q4 2013 to a low of $41.4 million in Q4 2012.
  • Average Construction in Progress over 5 years is $48.3 million, with a median of $47.4 million recorded in 2016.
  • Peak YoY movement for Construction in Progress: soared 56.97% in 2012, then decreased 11.36% in 2015.
  • A 5-year view of Construction in Progress shows it stood at $41.4 million in 2012, then skyrocketed by 33.0% to $55.1 million in 2013, then decreased by 5.91% to $51.8 million in 2014, then fell by 11.36% to $45.9 million in 2015, then rose by 3.23% to $47.4 million in 2016.
  • Per Business Quant, the three most recent readings for TFX's Construction in Progress are $47.4 million (Q4 2016), $45.9 million (Q4 2015), and $51.8 million (Q4 2014).