IES Holdings (IESC) Construction in Progress (2016 - 2025)
IES Holdings has reported Construction in Progress over the past 13 years, most recently at $12.1 million for Q3 2025.
- For the quarter ending Q3 2025, Construction in Progress rose 84.17% year-over-year to $12.1 million, compared with a TTM value of $12.1 million through Sep 2025, up 84.17%, and an annual FY2025 reading of $12.1 million, up 84.17% over the prior year.
- Construction in Progress came in at $12.1 million for Q3 2025, up from $6.6 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $12.1 million in Q3 2025 to a low of $539000.0 in Q3 2022.
- Median Construction in Progress over the past 5 years was $1.4 million (2023), compared with a mean of $4.4 million.
- The sharpest move saw Construction in Progress crashed 58.92% in 2022, then surged 381.2% in 2024.
- Over 5 years, Construction in Progress stood at $1.3 million in 2021, then tumbled by 58.92% to $539000.0 in 2022, then surged by 153.62% to $1.4 million in 2023, then surged by 381.2% to $6.6 million in 2024, then surged by 84.17% to $12.1 million in 2025.
- Per Business Quant, the three most recent readings for IESC's Construction in Progress are $12.1 million (Q3 2025), $6.6 million (Q3 2024), and $1.4 million (Q3 2023).