Stantec (STN) Construction in Progress (2016 - 2022)
Stantec has reported Construction in Progress over the past 7 years, most recently at $4.7 million for Q4 2022.
- Quarterly results put Construction in Progress at $4.7 million for Q4 2022, up 74.8% from a year ago — trailing twelve months through Dec 2022 was $4.7 million (up 74.8% YoY), and the annual figure for FY2022 was $4.9 million, up 81.44%.
- Construction in Progress for Q4 2022 was $4.7 million at Stantec, up from $2.7 million in the prior quarter.
- Over the last five years, Construction in Progress for STN hit a ceiling of $6.7 million in Q4 2018 and a floor of $153410.9 in Q4 2020.
- Median Construction in Progress over the past 5 years was $2.7 million (2021), compared with a mean of $3.1 million.
- Biggest five-year swings in Construction in Progress: crashed 89.34% in 2020 and later skyrocketed 1658.25% in 2021.
- Stantec's Construction in Progress stood at $6.7 million in 2018, then tumbled by 78.66% to $1.4 million in 2019, then crashed by 89.34% to $153410.9 in 2020, then skyrocketed by 1658.25% to $2.7 million in 2021, then skyrocketed by 74.8% to $4.7 million in 2022.
- The last three reported values for Construction in Progress were $4.7 million (Q4 2022), $2.7 million (Q4 2021), and $153410.9 (Q4 2020) per Business Quant data.