Growth Metrics

Stantec (STN) Construction in Progress (2016 - 2022)

Historic Construction in Progress for Stantec (STN) over the last 7 years, with Q4 2022 value amounting to $4.7 million.

  • Stantec's Construction in Progress rose 7479.79% to $4.7 million in Q4 2022 from the same period last year, while for Dec 2022 it was $4.7 million, marking a year-over-year increase of 7479.79%. This contributed to the annual value of $4.9 million for FY2022, which is 8144.4% up from last year.
  • Stantec's Construction in Progress amounted to $4.7 million in Q4 2022, which was up 7479.79% from $2.7 million recorded in Q4 2021.
  • Over the past 5 years, Stantec's Construction in Progress peaked at $6.7 million during Q4 2018, and registered a low of $153410.9 during Q4 2020.
  • In the last 5 years, Stantec's Construction in Progress had a median value of $2.7 million in 2021 and averaged $3.1 million.
  • In the last 5 years, Stantec's Construction in Progress crashed by 8934.09% in 2020 and then surged by 165824.7% in 2021.
  • Quarter analysis of 5 years shows Stantec's Construction in Progress stood at $6.7 million in 2018, then crashed by 78.66% to $1.4 million in 2019, then tumbled by 89.34% to $153410.9 in 2020, then skyrocketed by 1658.25% to $2.7 million in 2021, then soared by 74.8% to $4.7 million in 2022.
  • Its Construction in Progress was $4.7 million in Q4 2022, compared to $2.7 million in Q4 2021 and $153410.9 in Q4 2020.