Growth Metrics

Fluor (FLR) Construction in Progress: 2009-2018

  • Fluor's Construction in Progress fell 14.73% to $53.1 million in Q4 2018 from the same period last year, while for Dec 2018 it was $53.1 million, marking a year-over-year decrease of 14.73%. This contributed to the annual value of $53.1 million for FY2018, which is 14.73% down from last year.
  • Latest data reveals that Fluor reported Construction in Progress of $53.1 million as of Q4 2018, which was down 14.73% from $62.2 million recorded in Q4 2017.
  • In the past 5 years, Fluor's Construction in Progress ranged from a high of $74.0 million in Q4 2014 and a low of $43.6 million during Q4 2015.
  • Over the past 3 years, Fluor's median Construction in Progress value was $53.1 million (recorded in 2018), while the average stood at $55.1 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 43.33% in 2014, then tumbled by 40.99% in 2015.
  • Over the past 5 years, Fluor's Construction in Progress (Quarterly) stood at $74.0 million in 2014, then crashed by 40.99% to $43.6 million in 2015, then climbed by 14.67% to $50.0 million in 2016, then rose by 24.36% to $62.2 million in 2017, then fell by 14.73% to $53.1 million in 2018.
  • Its Construction in Progress stands at $53.1 million for Q4 2018, versus $62.2 million for Q4 2017 and $50.0 million for Q4 2016.