Fluor (FLR) Construction in Progress (2016 - 2018)
Fluor (FLR) has disclosed Construction in Progress for 10 consecutive years, with $53.1 million as the latest value for Q4 2018.
- Quarterly Construction in Progress fell 14.73% to $53.1 million in Q4 2018 from the year-ago period, while the trailing twelve-month figure was $53.1 million through Dec 2018, down 14.73% year-over-year, with the annual reading at $53.1 million for FY2018, 14.73% down from the prior year.
- Construction in Progress for Q4 2018 was $53.1 million at Fluor, down from $62.2 million in the prior quarter.
- The five-year high for Construction in Progress was $74.0 million in Q4 2014, with the low at $43.6 million in Q4 2015.
- Average Construction in Progress over 5 years is $56.6 million, with a median of $53.1 million recorded in 2018.
- The sharpest move saw Construction in Progress skyrocketed 43.33% in 2014, then crashed 40.99% in 2015.
- Over 5 years, Construction in Progress stood at $74.0 million in 2014, then plummeted by 40.99% to $43.6 million in 2015, then rose by 14.67% to $50.0 million in 2016, then increased by 24.36% to $62.2 million in 2017, then dropped by 14.73% to $53.1 million in 2018.
- According to Business Quant data, Construction in Progress over the past three periods came in at $53.1 million, $62.2 million, and $50.0 million for Q4 2018, Q4 2017, and Q4 2016 respectively.