Fluor (FLR) Construction in Progress (2016 - 2018)
Fluor (FLR) has disclosed Construction in Progress for 10 consecutive years, with $53.1 million as the latest value for Q4 2018.
- On a quarterly basis, Construction in Progress fell 14.73% to $53.1 million in Q4 2018 year-over-year; TTM through Dec 2018 was $53.1 million, a 14.73% decrease, with the full-year FY2018 number at $53.1 million, down 14.73% from a year prior.
- Construction in Progress was $53.1 million for Q4 2018 at Fluor, down from $62.2 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $74.0 million in Q4 2014 to a low of $43.6 million in Q4 2015.
- A 5-year average of $56.6 million and a median of $53.1 million in 2018 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: soared 43.33% in 2014, then tumbled 40.99% in 2015.
- Fluor's Construction in Progress stood at $74.0 million in 2014, then crashed by 40.99% to $43.6 million in 2015, then increased by 14.67% to $50.0 million in 2016, then grew by 24.36% to $62.2 million in 2017, then fell by 14.73% to $53.1 million in 2018.
- Per Business Quant, the three most recent readings for FLR's Construction in Progress are $53.1 million (Q4 2018), $62.2 million (Q4 2017), and $50.0 million (Q4 2016).