Growth Metrics

Fluor (FLR) Construction in Progress (2016 - 2018)

Fluor has reported Construction in Progress over the past 10 years, most recently at $53.1 million for Q4 2018.

  • Quarterly Construction in Progress fell 14.73% to $53.1 million in Q4 2018 from the year-ago period, while the trailing twelve-month figure was $53.1 million through Dec 2018, down 14.73% year-over-year, with the annual reading at $53.1 million for FY2018, 14.73% down from the prior year.
  • Construction in Progress was $53.1 million for Q4 2018 at Fluor, down from $62.2 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $74.0 million in Q4 2014 and troughed at $43.6 million in Q4 2015.
  • The 5-year median for Construction in Progress is $53.1 million (2018), against an average of $56.6 million.
  • Year-over-year, Construction in Progress soared 43.33% in 2014 and then tumbled 40.99% in 2015.
  • A 5-year view of Construction in Progress shows it stood at $74.0 million in 2014, then tumbled by 40.99% to $43.6 million in 2015, then grew by 14.67% to $50.0 million in 2016, then rose by 24.36% to $62.2 million in 2017, then decreased by 14.73% to $53.1 million in 2018.
  • Per Business Quant, the three most recent readings for FLR's Construction in Progress are $53.1 million (Q4 2018), $62.2 million (Q4 2017), and $50.0 million (Q4 2016).