Fluor (FLR) Construction in Progress (2016 - 2018)
Historic Construction in Progress for Fluor (FLR) over the last 10 years, with Q4 2018 value amounting to $53.1 million.
- Fluor's Construction in Progress fell 1472.76% to $53.1 million in Q4 2018 from the same period last year, while for Dec 2018 it was $53.1 million, marking a year-over-year decrease of 1472.76%. This contributed to the annual value of $53.1 million for FY2018, which is 1472.76% down from last year.
- Fluor's Construction in Progress amounted to $53.1 million in Q4 2018, which was down 1472.76% from $62.2 million recorded in Q4 2017.
- Fluor's 5-year Construction in Progress high stood at $74.0 million for Q4 2014, and its period low was $43.6 million during Q4 2015.
- In the last 5 years, Fluor's Construction in Progress had a median value of $53.1 million in 2018 and averaged $56.6 million.
- In the last 5 years, Fluor's Construction in Progress surged by 4333.44% in 2014 and then crashed by 4099.13% in 2015.
- Quarter analysis of 5 years shows Fluor's Construction in Progress stood at $74.0 million in 2014, then plummeted by 40.99% to $43.6 million in 2015, then grew by 14.67% to $50.0 million in 2016, then increased by 24.36% to $62.2 million in 2017, then dropped by 14.73% to $53.1 million in 2018.
- Its last three reported values are $53.1 million in Q4 2018, $62.2 million for Q4 2017, and $50.0 million during Q4 2016.