Fluor (FLR) Construction in Progress (2016 - 2018)
Historic Construction in Progress for Fluor (FLR) over the last 10 years, with Q4 2018 value amounting to $53.1 million.
- Fluor's Construction in Progress fell 1472.76% to $53.1 million in Q4 2018 from the same period last year, while for Dec 2018 it was $53.1 million, marking a year-over-year decrease of 1472.76%. This contributed to the annual value of $53.1 million for FY2018, which is 1472.76% down from last year.
- Fluor's Construction in Progress amounted to $53.1 million in Q4 2018, which was down 1472.76% from $62.2 million recorded in Q4 2017.
- Fluor's Construction in Progress' 5-year high stood at $74.0 million during Q4 2014, with a 5-year trough of $43.6 million in Q4 2015.
- Its 5-year average for Construction in Progress is $56.6 million, with a median of $53.1 million in 2018.
- Per our database at Business Quant, Fluor's Construction in Progress skyrocketed by 4333.44% in 2014 and then tumbled by 4099.13% in 2015.
- Fluor's Construction in Progress (Quarter) stood at $74.0 million in 2014, then crashed by 40.99% to $43.6 million in 2015, then rose by 14.67% to $50.0 million in 2016, then grew by 24.36% to $62.2 million in 2017, then fell by 14.73% to $53.1 million in 2018.
- Its Construction in Progress was $53.1 million in Q4 2018, compared to $62.2 million in Q4 2017 and $50.0 million in Q4 2016.