Growth Metrics

Steris (STE) Construction in Progress (2018 - 2025)

Steris has reported Construction in Progress over the past 8 years, most recently at $586.6 million for Q4 2025.

  • For Q4 2025, Construction in Progress rose 15.06% year-over-year to $586.6 million; the TTM value through Dec 2025 reached $586.6 million, up 15.06%, while the annual FY2025 figure was $512.1 million, 2.4% up from the prior year.
  • Construction in Progress for Q4 2025 was $586.6 million at Steris, up from $571.9 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $586.6 million in Q4 2025 and troughed at $211.4 million in Q1 2021.
  • A 5-year average of $452.3 million and a median of $481.0 million in 2022 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: soared 68.42% in 2022 and later dropped 0.96% in 2025.
  • Year by year, Construction in Progress stood at $341.0 million in 2021, then surged by 43.61% to $489.8 million in 2022, then rose by 4.61% to $512.4 million in 2023, then decreased by 0.5% to $509.8 million in 2024, then grew by 15.06% to $586.6 million in 2025.
  • Business Quant data shows Construction in Progress for STE at $586.6 million in Q4 2025, $571.9 million in Q3 2025, and $560.9 million in Q2 2025.