Steris (STE) Construction in Progress (2018 - 2025)
Steris has reported Construction in Progress over the past 8 years, most recently at $586.6 million for Q4 2025.
- Quarterly results put Construction in Progress at $586.6 million for Q4 2025, up 15.06% from a year ago — trailing twelve months through Dec 2025 was $586.6 million (up 15.06% YoY), and the annual figure for FY2025 was $512.1 million, up 2.4%.
- Construction in Progress for Q4 2025 was $586.6 million at Steris, up from $571.9 million in the prior quarter.
- Over the last five years, Construction in Progress for STE hit a ceiling of $586.6 million in Q4 2025 and a floor of $211.4 million in Q1 2021.
- Median Construction in Progress over the past 5 years was $481.0 million (2022), compared with a mean of $452.3 million.
- Biggest five-year swings in Construction in Progress: surged 68.42% in 2022 and later fell 0.96% in 2025.
- Steris' Construction in Progress stood at $341.0 million in 2021, then skyrocketed by 43.61% to $489.8 million in 2022, then increased by 4.61% to $512.4 million in 2023, then dropped by 0.5% to $509.8 million in 2024, then rose by 15.06% to $586.6 million in 2025.
- The last three reported values for Construction in Progress were $586.6 million (Q4 2025), $571.9 million (Q3 2025), and $560.9 million (Q2 2025) per Business Quant data.