Steris (STE) Construction in Progress (2018 - 2025)
Historic Construction in Progress for Steris (STE) over the last 8 years, with Q4 2025 value amounting to $586.6 million.
- Steris' Construction in Progress rose 1506.43% to $586.6 million in Q4 2025 from the same period last year, while for Dec 2025 it was $586.6 million, marking a year-over-year increase of 1506.43%. This contributed to the annual value of $512.1 million for FY2025, which is 239.83% up from last year.
- Per Steris' latest filing, its Construction in Progress stood at $586.6 million for Q4 2025, which was up 1506.43% from $571.9 million recorded in Q3 2025.
- Steris' Construction in Progress' 5-year high stood at $586.6 million during Q4 2025, with a 5-year trough of $211.4 million in Q1 2021.
- In the last 5 years, Steris' Construction in Progress had a median value of $481.0 million in 2022 and averaged $452.3 million.
- Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 6842.24% in 2022, then tumbled by 95.99% in 2025.
- Over the past 5 years, Steris' Construction in Progress (Quarter) stood at $341.0 million in 2021, then soared by 43.61% to $489.8 million in 2022, then grew by 4.61% to $512.4 million in 2023, then decreased by 0.5% to $509.8 million in 2024, then increased by 15.06% to $586.6 million in 2025.
- Its last three reported values are $586.6 million in Q4 2025, $571.9 million for Q3 2025, and $560.9 million during Q2 2025.