SITE Centers (SITC) Construction in Progress (2016 - 2026)

SITE Centers has reported Construction in Progress over the past 17 years, most recently at $2.6 million for Q4 2025.

  • Quarterly Construction in Progress fell 4.77% to $2.6 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $2.6 million through Dec 2025, down 4.77% year-over-year, with the annual reading at $2.6 million for FY2025, 4.77% down from the prior year.
  • Construction in Progress was $2.6 million for Q4 2025 at SITE Centers, down from $4.4 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $62.8 million in Q2 2022 and troughed at $2.6 million in Q4 2025.
  • The 5-year median for Construction in Progress is $42.8 million (2021), against an average of $37.3 million.
  • Year-over-year, Construction in Progress skyrocketed 49.01% in 2022 and then tumbled 94.89% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $47.3 million in 2021, then increased by 19.48% to $56.5 million in 2022, then crashed by 32.92% to $37.9 million in 2023, then plummeted by 92.92% to $2.7 million in 2024, then fell by 4.77% to $2.6 million in 2025.
  • Per Business Quant, the three most recent readings for SITC's Construction in Progress are $2.6 million (Q4 2025), $4.4 million (Q3 2025), and $2.7 million (Q2 2025).