SITE Centers (SITC) Construction in Progress (2016 - 2025)
SITE Centers (SITC) has disclosed Construction in Progress for 17 consecutive years, with $2.6 million as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress fell 4.77% to $2.6 million in Q4 2025 year-over-year; TTM through Dec 2025 was $2.6 million, a 4.77% decrease, with the full-year FY2025 number at $2.6 million, down 4.77% from a year prior.
- Construction in Progress was $2.6 million for Q4 2025 at SITE Centers, down from $4.4 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $62.8 million in Q2 2022 to a low of $2.6 million in Q4 2025.
- A 5-year average of $37.3 million and a median of $42.8 million in 2021 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: skyrocketed 49.01% in 2022, then tumbled 94.89% in 2025.
- SITE Centers' Construction in Progress stood at $47.3 million in 2021, then rose by 19.48% to $56.5 million in 2022, then plummeted by 32.92% to $37.9 million in 2023, then tumbled by 92.92% to $2.7 million in 2024, then dropped by 4.77% to $2.6 million in 2025.
- Per Business Quant, the three most recent readings for SITC's Construction in Progress are $2.6 million (Q4 2025), $4.4 million (Q3 2025), and $2.7 million (Q2 2025).