Ventas (VTR) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Ventas (VTR) over the last 17 years, with Q4 2025 value amounting to $358.8 million.
- Ventas' Construction in Progress rose 671.56% to $358.8 million in Q4 2025 from the same period last year, while for Dec 2025 it was $358.8 million, marking a year-over-year increase of 671.56%. This contributed to the annual value of $358.8 million for FY2025, which is 671.56% up from last year.
- According to the latest figures from Q4 2025, Ventas' Construction in Progress is $358.8 million, which was up 671.56% from $346.0 million recorded in Q3 2025.
- Over the past 5 years, Ventas' Construction in Progress peaked at $459.0 million during Q3 2023, and registered a low of $251.3 million during Q2 2022.
- Moreover, its 5-year median value for Construction in Progress was $336.1 million (2023), whereas its average is $335.2 million.
- Its Construction in Progress has fluctuated over the past 5 years, first tumbled by 4727.43% in 2021, then surged by 7770.88% in 2023.
- Over the past 5 years, Ventas' Construction in Progress (Quarter) stood at $269.3 million in 2021, then rose by 15.28% to $310.5 million in 2022, then increased by 18.58% to $368.1 million in 2023, then dropped by 8.67% to $336.2 million in 2024, then grew by 6.72% to $358.8 million in 2025.
- Its last three reported values are $358.8 million in Q4 2025, $346.0 million for Q3 2025, and $306.0 million during Q2 2025.