Welltower (WELL) Construction in Progress (2016 - 2026)
Welltower has reported Construction in Progress over the past 18 years, most recently at $764.2 million for Q1 2026.
- Quarterly Construction in Progress fell 26.88% to $764.2 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $764.2 million through Mar 2026, down 26.88% year-over-year, with the annual reading at $738.9 million for FY2025, 39.42% down from the prior year.
- Construction in Progress was $764.2 million for Q1 2026 at Welltower, up from $738.9 million in the prior quarter.
- Over five years, Construction in Progress peaked at $1.5 billion in Q2 2024 and troughed at $511.6 million in Q3 2025.
- The 5-year median for Construction in Progress is $1.0 billion (2025), against an average of $1.0 billion.
- Year-over-year, Construction in Progress surged 96.28% in 2022 and then plummeted 62.79% in 2025.
- A 5-year view of Construction in Progress shows it stood at $1.0 billion in 2022, then grew by 27.75% to $1.3 billion in 2023, then decreased by 6.49% to $1.2 billion in 2024, then plummeted by 39.42% to $738.9 million in 2025, then rose by 3.43% to $764.2 million in 2026.
- Per Business Quant, the three most recent readings for WELL's Construction in Progress are $764.2 million (Q1 2026), $738.9 million (Q4 2025), and $511.6 million (Q3 2025).