Welltower (WELL) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Welltower (WELL) over the last 17 years, with Q4 2025 value amounting to $738.9 million.
- Welltower's Construction in Progress fell 3942.39% to $738.9 million in Q4 2025 from the same period last year, while for Dec 2025 it was $738.9 million, marking a year-over-year decrease of 3942.39%. This contributed to the annual value of $738.9 million for FY2025, which is 3942.39% down from last year.
- According to the latest figures from Q4 2025, Welltower's Construction in Progress is $738.9 million, which was down 3942.39% from $511.6 million recorded in Q3 2025.
- Welltower's 5-year Construction in Progress high stood at $1.5 billion for Q2 2024, and its period low was $458.8 million during Q2 2021.
- Its 5-year average for Construction in Progress is $957.9 million, with a median of $1.0 billion in 2022.
- Per our database at Business Quant, Welltower's Construction in Progress soared by 9628.31% in 2022 and then crashed by 6279.45% in 2025.
- Over the past 5 years, Welltower's Construction in Progress (Quarter) stood at $651.4 million in 2021, then skyrocketed by 56.75% to $1.0 billion in 2022, then rose by 27.75% to $1.3 billion in 2023, then decreased by 6.49% to $1.2 billion in 2024, then crashed by 39.42% to $738.9 million in 2025.
- Its last three reported values are $738.9 million in Q4 2025, $511.6 million for Q3 2025, and $712.1 million during Q2 2025.