Welltower (WELL) Construction in Progress (2016 - 2025)
Welltower (WELL) has disclosed Construction in Progress for 17 consecutive years, with $738.9 million as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress fell 39.42% to $738.9 million in Q4 2025 year-over-year; TTM through Dec 2025 was $738.9 million, a 39.42% decrease, with the full-year FY2025 number at $738.9 million, down 39.42% from a year prior.
- Construction in Progress was $738.9 million for Q4 2025 at Welltower, up from $511.6 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $1.5 billion in Q2 2024 to a low of $458.8 million in Q2 2021.
- A 5-year average of $957.9 million and a median of $1.0 billion in 2022 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: surged 96.28% in 2022, then plummeted 62.79% in 2025.
- Welltower's Construction in Progress stood at $651.4 million in 2021, then soared by 56.75% to $1.0 billion in 2022, then increased by 27.75% to $1.3 billion in 2023, then fell by 6.49% to $1.2 billion in 2024, then tumbled by 39.42% to $738.9 million in 2025.
- Per Business Quant, the three most recent readings for WELL's Construction in Progress are $738.9 million (Q4 2025), $511.6 million (Q3 2025), and $712.1 million (Q2 2025).